Skip to main content

Custom closets in Vancouver

Delwin Construction designs and installs custom closets in Vancouver, plus office and media millwork, wine cellars and trim. If the closet keeps its walls, it's design and installation; a walk-in or lighting adds framing, wiring and possibly a permit.

  • Free on-site consultation and quote
  • Clear and detailed pricing
Living room with a grey accent wall, TV over a linear gas fireplace and a black built-in media console
Built-in media console
Lit reach-in closet with a hanging rail and shelves, next to the built-in laundry niche

Licence and reviews

What custom closets and millwork include

Custom closets and millwork from Delwin Construction are measured and designed for the room, so they can fill sloped ceilings, alcoves and walls that aren’t square. The job can be one bedroom closet or part of a basement renovation or full home renovation.

Kitchen cabinets and bathroom vanities are planned with their rooms under kitchen renovations and bathroom renovations.

Before: attic landing with an exposed washer and dryer beside a sliding-door closet under a sloped ceiling
Built-in laundry niche with a lit shelf above a front-load washer and dryer
Before After

Before and after: an attic laundry

An exposed washer and dryer on the landing became a built-in laundry niche with a lit shelf above it.

How the work goes, step by step

  1. Step 1: Free on-site consultation

    We see the space and hear what you need stored.

  2. Step 2: A design for the room

    Bring a sketch or photos; we design around the room.

  3. Step 3: Quote and timeline

    Detailed pricing and a timeline, with any electrician scheduled in.

  4. Step 4: Installation

    Old closet out, new work in, paint where needed.

What you get

  • Walk-in and bedroom closets,

    laid out around what you own

  • Office and media millwork,

    desks, shelving and TV units

  • Wine cellars and garage organization,

    designed and installed

  • Window and door casing,

    including after new windows or floors

  • One closet or part of a renovation,

    quoted either way

Questions about custom millwork and closets

Can you build a single closet or replace window and door casing?

Yes. A closet or trim job doesn't have to be part of a full renovation. Derek B. wrote on Google in September 2026 that our crew fit me in last minute with their very busy schedule to do a window and door casing surround. Another customer had a single bedroom closet replaced start to finish. Tell us about the job when you book the consultation, and we'll quote it on its own.

What can custom millwork include in a home?

In a home, custom millwork is storage and trim made to fit the room instead of bought in standard sizes. We design and install walk-in closets, office millwork such as built-in desks and shelving, media millwork around a TV, wine cellars and garage organization. Window and door casing is millwork too. It can be a job on its own or part of a basement or full home renovation.

Can a laundry room be turned into a home office?

Yes. Shiva F. wrote on Google in December 2023 about Delwin turning a laundry room into an awesome home office. What it takes depends on the washer and dryer. If they move or go, the water lines, drain and dryer vent need plumbing work, and a desk may need new outlets or lighting. Ask about permits at the consultation. Built-in office millwork makes the most of a small room.

How long does a custom closet take to install?

It depends on the size of the closet and what changes around it. Kaveh A. wrote on Google in November 2025 that the crew completed the job in two days all the way from removing the old closet, installing the new closet, and painting. A walk-in closet, a wall of office millwork or a job that moves a wall usually takes longer. We plan the timeline before work starts and explain it to you.

Start with a free on-site consultation

We visit the space and send a free quote with clear, detailed pricing. Kiera K. wrote about working with us from the initial consultation to the final touches.

Call (604) 808-8567 Book a free on-site consultation