Bathroom renovation in Vancouver, tile and showers
Delwin Construction starts a bathroom renovation in Vancouver with a free on-site quote, then installs the tile, vanity and shower. Keep the tub only if someone uses it; if not, a walk-in shower can go in its spot.
- Free on-site consultation and quote
- Clear and detailed pricing
Licence and reviews
City of Vancouver licence
What a bathroom renovation covers
A bathroom renovation with Delwin Construction is either a refresh (vanity, lighting, floor) or a full renovation with new tile and a new shower or tub. We supply and install the finishes and coordinate the plumbing and electrical trades.
If the bathroom is one part of a bigger job, start with full home renovations. For a bathroom below grade, see basement renovations.
“The results of my two bathroom renovations are beyond satisfying…”
Full review from Rina P.
The results of my two bathroom renovations are beyond satisfying, especially with Victor's beautiful lighting and the finishing touches and cleanup that I know weren't Victor & Edi's! I truly appreciate the hard work of the crew at Delwin Construction!!! Thank you Amir &Thomas , you two have an amazing crew!🙏❤️
Inside this attic bathroom
What you get
-
Floor and wall tile,
natural stone, porcelain, ceramic or mosaic
-
Walk-in showers with glass doors,
or a new tub
-
Vanities and bathroom cabinetry,
with a countertop to match
-
New lighting fixtures
-
Trades coordinated to a timeline,
stages planned before work starts
Bathrooms
-
Open photo 1 of 4 Floating vanity, travertine wall
-
Open photo 2 of 4 Double vanity, walk-in shower
-
Open photo 3 of 4 Herringbone tile, black fixtures
-
Open photo 4 of 4 Walk-in shower, sliding door
How the work goes, step by step
-
Step 1: Free on-site consultation
We see the bathroom and hear what you want changed.
-
Step 2: Finishes and a detailed quote
Pick the finishes; the detailed quote shows what each costs.
-
Step 3: A timeline before work starts
We plan the stages and book the trades around them.
-
Step 4: Build the new bathroom
The crew builds what you approved: tile, floor, vanity, shower.
Guides for this service
- City of Vancouver building permit fees for renovations in 2026 Cost guide
- Do you need a renovation permit in Vancouver? Rules and permits
- Plumbing permits in Vancouver: who can apply and what it costs Rules and permits
- BC seniors' home renovation tax credit: 10% back, up to $1,000 a year Rules and permits
All guides on permits in Vancouver All guides on renovation costs, rebates and tax credits All guides on condo and strata renovations All guides on hiring a contractor in BC All guides on older and heritage homes All guides on renovating by neighbourhood
Questions about bathroom renovations
Can a bathtub be replaced with a walk-in shower?
Yes. We supply and install walk-in showers and glass shower doors, so the tub can come out and a shower can go in the same spot. Keeping the shower where the tub was means the drain and water lines stay close to where they are now. Before you remove your only tub, think about who uses it: young children and anyone who takes baths may still need one somewhere in the home.
Can you renovate two bathrooms at the same time?
Yes. Two bathrooms can be planned and quoted as one project, and we have renovated two bathrooms for the same client. Rina P.'s Google review says: The results of my two bathroom renovations are beyond satisfying...
If those are the only bathrooms in your home, tell us at the consultation, and we plan the order of work around your needs.
How do I start a bathroom renovation?
Start with a list of what isn't working: too little storage, a tub nobody uses, dim lighting, or tile and grout that keep failing. Save a few photos of bathrooms you like. Then book a free on-site consultation and quote. You get a quote with clear and detailed pricing, so you can settle the scope and the finishes before any work is booked.
How can I keep bathroom renovation costs down?
Leave the toilet, shower and sink where they are, so the drains and water lines don't have to move. Keep anything that is still sound, such as a tub you like. Tile the shower and the floor rather than every wall. Then read the quote's detailed pricing to see which items cost the most, and decide what is worth changing.
Start with a free on-site consultation
We visit the space and send a free quote with clear, detailed pricing. Kiera K. wrote about working with us from the initial consultation to the final touches.