Deck builder in Vancouver for outdoor living
Delwin Construction is a deck builder in Vancouver that also builds patios, patio covers and outdoor lighting. Building or altering a deck generally needs a City of Vancouver permit; minor repairs don't.
- Free on-site consultation and quote
- Clear and detailed pricing
Licence and reviews
City of Vancouver licence
What our outdoor living work includes
Outdoor living work can be one item or several planned together, such as a deck with a cover, a ceiling and lights. One City rule shapes many designs: a patio more than 2 feet above grade needs a guard and counts as a deck. A patio at grade avoids both.
For other outdoor work, ask at the free on-site consultation. For a bigger job, see full home renovations.
The room outside
How a deck job runs
-
Step 1: Free on-site consultation and quote
Have your property survey handy.
-
Step 2: Stages and timeline
With time for any City permit.
-
Step 3: The build
Frame, decking, cover and lights.
What you get
-
Decks and patio covers,
planned and built as one project
-
Ceilings and custom lighting,
so the deck works after dark
-
Fire pits and water features,
gas and power planned early
-
Stages planned ahead,
trades coordinated to keep each on schedule
Guides on permits in Vancouver
- City of Vancouver retaining wall permit: the 1.2 m line Rules and permits
- Deck permit in Vancouver: when you need one and what to submit Rules and permits
- Fence height in Vancouver: the limit for each yard Rules and permits
- Tree removal permit in Vancouver: the 20 cm rule, fees and documents Rules and permits
Questions about outdoor living renovations
Do I need a permit to build a deck in Vancouver?
Generally, yes. The City of Vancouver lists building or altering a deck among the work that generally needs a permit, while non-structural maintenance and minor exterior repairs don't. City zoning also treats a patio raised more than 2 feet above grade as a deck. If you live elsewhere in Metro Vancouver, your own municipality's rules apply, so check with its permit office before the design is final.
Do I need a permit to replace a patio cover in Vancouver?
Check before you start. The City of Vancouver's permit page doesn't name patio covers. It does list structural repairs and building or altering a deck as work that generally needs a permit, and a cover has posts, beams and a roof. When in doubt, the City says to ask its Development and Building Services Centre. A bigger cover, or one where there was none, can also raise zoning questions.
What outdoor projects do you take on?
We build decks, patios, patio covers and outdoor ceilings, and we add fire pits, water features and custom outdoor lighting. You can combine them in one project, such as a deck with a cover, a finished ceiling and lights. We work in Vancouver and across Metro Vancouver. Tell us what you have in mind at the free on-site consultation, and we'll quote the whole plan.
Start with a free on-site consultation
We visit the space and send a free quote with clear, detailed pricing. Kiera K. wrote about working with us from the initial consultation to the final touches.