Skip to main content

Basements and secondary suites

Turning a Vancouver basement into living space or a legal secondary suite: the City's rules, the permits and inspections, and what a suite has to include.

Finished basement home gym with grey walls, laminate floor, spin bikes, a treadmill and a stair climber

Every guide on basements and secondary suites

  1. Basement finishing permit in Vancouver: which work needs one

    You need a basement finishing permit in Vancouver once you add or move walls or move plumbing, wiring or gas lines, while paint, flooring and fixtures in place need none. A simple job under $250,000 can get its permit within one week on the City's fast track, and a rec room or extra bedroom needs no development permit.

    Rules and permits. Updated

  2. Finished basement or legal suite in Vancouver: how to choose

    Pick a finished basement or a legal suite in Vancouver by who will live there: rooms for your own household, a suite for a separate one. Rec rooms and bedrooms need no development permit, while a suite takes development and building permits and is legal only after a passed final inspection.

    Decision guide. Updated

  3. Laneway house vs basement suite in Vancouver: what each lot allows

    In the laneway house vs basement suite choice, Vancouver's rules start with the lot: a duplex can have a suite but not a laneway house. A laneway house also needs a site 9.8 m wide, or at least 7.3 m with the City's approval, and a suite needs 37 m² or more inside the house.

    Decision guide. Updated

  4. Legal basement suite in Vancouver: the City's rules and permits

    A legal basement suite in Vancouver is one the City has approved through a development and building permit, with its own kitchen, living area and outside entrance. It becomes legal only when it passes the final inspection, and a one-family house can have just one suite.

    Rules and permits. Updated

Its own door, its own kitchen

Start with a free on-site consultation

We visit the space and send a free quote with clear, detailed pricing. Kiera K. wrote about working with us from the initial consultation to the final touches.

Call (604) 808-8567 Book a free on-site consultation