Skip to main content

Dunbar-Southlands renovation permits: where rebuilding leads

Dunbar-Southlands renovation permits are outnumbered by rebuild permits: in the year to 22 November 2026, the City issued 42 there, against 77 for new buildings and 57 for demolitions. A renovation permit took a median of 47 days, against 35 city-wide, but its slow tail was shorter than the city's.

By the Delwin Construction team Updated

Open-concept white shaker kitchen with a quartz island, brass pulls and globe pendant lights

Key findings: Dunbar-Southlands rebuilds more than it renovates

The City issued 176 home permits in Dunbar-Southlands over the year to 22 November 2026, and only 42 covered renovations and additions. The rest were for new buildings and demolitions. That mix is the reverse of the city’s, and it changes how an owner here should read the waits.

  • Demolition permits outnumbered renovation permits, 57 to 42.
  • Renovation permits were slower at the median than the city’s, 47 days against 35, yet only 1 in 10 ran past 150 days, against 182 city-wide.
  • Dunbar-Southlands renovations were declared at modest values: a median of $42,500, against $60,000 city-wide. A declared value is what the applicant estimates the work at to set the permit fee; it isn’t a price.
  • Only 34 of the city’s 2,263 Heritage Register buildings in the City’s 2023 data were in Dunbar-Southlands.

Dunbar-Southlands at a glance

Computed from 176 records for Dunbar-Southlands, beside the same figures for City of Vancouver. Every neighbourhood in City of Vancouver

Dunbar-Southlands compared with City of Vancouver
Figure Dunbar-Southlands City of Vancouver
Renovation and addition permits 42 1,056
Median wait for a renovation permit 47 days 35 days
1 in 10 renovation permits waited longer than 150 days 182 days
All home permits (renovation, new building, demolition) 176 2,639

Home permits in Dunbar-Southlands, Vancouver: renovations, new buildings and demolitions

Data refreshed . Source: City of Vancouver Open Data Portal: Issued building permits.

Home permits in Dunbar-Southlands, Vancouver: renovations, new buildings and demolitions: the full table
Type of work (City category) Permits issued Median wait (days) 1 in 10 waited longer than (days)
Addition / Alteration 4247150
Demolition / Deconstruction 57139397
New Building 77171398

How we collected it

Building permits the City of Vancouver first issued in the 12 months before the refresh date for residential property (the City's PropertyUse 'Dwelling Uses') in the City's Dunbar-Southlands local area (geolocalarea), grouped by the City's TypeofWork: 'Addition / Alteration' (renovations and additions to existing homes, every complexity), 'New Building' and 'Demolition / Deconstruction'; other types of work (temporary buildings, salvage and abatement) are left out. Rows are in alphabetical order, so renovations come first. Days are the City's PermitElapsedDays: calendar days, weekends and holidays included, from the day the application got a permit number to the day the permit was first issued, so they include time the applicant spent completing the application and answering conditions. Median and 90th percentile are computed by the portal's aggregate functions (percentiles are estimates) and rounded to whole days. Applications still in progress or withdrawn are not in the data. Addresses, applicants and contractors are not used. Contains information licensed under the Open Government Licence - Vancouver (https://opendata.vancouver.ca/pages/licence/).

Period covered
to
Data refreshed
November 22, 2026

Dunbar-Southlands renovation permits: where rebuilding leads

Local data, Renovating by neighbourhood

Updated

By the Delwin Construction team

Almost two new-home permits for every renovation

City-wide, renovations still led, with 1,056 home renovation permits against 969 for new buildings. Dunbar-Southlands flips that order: 77 new-building permits against 42 renovations. The 57 demolitions in the same year suggest that much of the new building followed a house coming down. The data doesn’t link a demolition to the permit that came after it on the same lot, though.

The data doesn’t record why owners here chose to rebuild. The Heritage Register lists few buildings in the area, 34 in the City’s 2023 data. That doesn’t take a house out of heritage review. Council can delay the demolition of a listed building, or of one it finds may have heritage value, for up to 120 days.

A renovation permit here: a slower median, a shorter tail

Dunbar-Southlands renovation permits had an unusual spread. The typical one waited longer than across the city, but very long waits were rarer. Here the median was 47 days and only 1 in 10 passed 150, a narrower gap than the city’s 35 and 182. With 42 permits behind those figures, the shape can change from one quarter to the next. For planning, it means a renovation start date here can sit closer to the median than it would city-wide.

The declared values point to modest jobs. The area’s median declared value was $42,500, a long way under $153,000. That is the total project cost at which the City’s energy requirements for house renovations begin, for applications after 15 September 2025.

Renovate or rebuild in Dunbar-Southlands: what the numbers say

On waits alone, renovating won clearly here. The median new-building permit, 171 days, took longer than 9 in 10 renovation permits in the area. A rebuild also needs a demolition permit: those took a median of 139 days, and 1 in 10 demolitions ran past 397 days, against 279 city-wide.

Each route has its own rules, set out in our guide to renovating or rebuilding in Vancouver. Either one starts with the same check: in BC, the owner must have a qualified person inspect for hazardous materials before renovation or demolition work begins. Taking down a house built before 1950 means reusing or recycling at least 75% of its materials by weight, with a $15,310 deposit as of November 2026. BC Housing generally treats a house that keeps 25% or less of its above-foundation structure as a new home. That calls for home warranty insurance arranged by a licensed builder, or a formal exemption such as an Owner Builder Authorization.

If you’re keeping the house, a whole-home renovation of a Dunbar house or a basement renovation stays on the renovation permit, with its shorter wait. To see how other neighbourhoods split between renovating and rebuilding, open Vancouver renovation permits by neighbourhood. To weigh both routes for your lot, book a free on-site consultation.

What the Dunbar-Southlands data can’t tell you

The counts show how many permits of each type the City issued, not what each house looked like before or after, or what the work cost. A declared value is the applicant’s own estimate for the fee, which can differ from what the work finally costs.

Forty-two renovation permits is a small base. A single quarter with several unusually quick or slow permits can shift the median by days and the tail by weeks. Check the figures above against the date marked Data refreshed. The area’s 34 heritage listings date from the City’s March 2023 open data, so any listing added since then isn’t in that number.

Dunbar-Southlands and the city: what owners declare, and what is listed
Dunbar-SouthlandsCity of Vancouver
Median declared value of a renovation permit, 12 months to 22 Nov 2026 $42,500 $60,000
Buildings listed on the Vancouver Heritage Register (City open data, 2023) 34 buildings 2263 buildings

Questions people ask

Why are so many houses in Dunbar being rebuilt?

The permit data doesn't record owners' reasons, so it can't say. It does show the scale: over the year to 22 November 2026, the City issued 77 new-building and 57 demolition permits in Dunbar-Southlands, against 42 for renovations. Few buildings there are on the Heritage Register, 34 in the City's 2023 data. Council's demolition delay of up to 120 days also covers a house it finds may have heritage value.

Is a renovation permit in Dunbar-Southlands faster than one for a new house?

Much faster. Over the year to 22 November 2026, a renovation permit there took a median of 47 days, against 171 for a new building. Only 1 in 10 renovation permits went beyond 150 days, against 398 for new buildings. A rebuild also needs a demolition permit, which took a median of 139 days in the area.

What should I check before renovating a house in Dunbar?

Three things. In BC, the owner must have a qualified person inspect the building for hazardous materials before renovation work begins. Check whether the house is on the Heritage Register, though only 34 Dunbar-Southlands buildings were in the City's 2023 data. And if little of the old house will remain, ask whether BC Housing would treat it as a new home.

Start with a free on-site consultation

We visit the space and send a free quote with clear, detailed pricing. Kiera K. wrote about working with us from the initial consultation to the final touches.

Call (604) 808-8567 Book a free on-site consultation