Leaky condo era in Vancouver: what to check in a 1980s or 1990s condo
The leaky condo era in Vancouver covers buildings from the late 1980s and the 1990s: in CMHC's 1996 survey, almost 50% of problem buildings dated from 1988 to 1990. The year alone proves nothing about one building, so read the strata's records on its walls, windows and balconies before you buy or renovate a unit.
By the Delwin Construction team Updated
What the leaky condo era was, and why the year built matters
In the leaky condo era, many low-rise wood-frame condo buildings in coastal BC let rain into their walls, where the wood framing rotted. CMHC’s 1996 survey of those building envelope failures found that almost 50% of the problem buildings were built from 1988 to 1990, and another 16% in 1994.
The response came in 1998. The Barrett Commission released its report, “The Renewal of Trust in Residential Construction”, on June 18, 1998, with 82 recommendations. BC’s Homeowner Protection Act was assented to on July 30, 1998.
The chart and table below count strata units on the City of Vancouver’s 2026 tax roll, grouped by the year each building went up. 1994 stands out: 5,243 units, the most of any year from 1980 to 2002, and the year CMHC tied to another 16% of its problem buildings. Every year from 1993 to 2000 holds more units than any year from 1980 to 1992. Most of the units in the table date from before 1998.
That’s why the year built is worth checking, and why it’s only a start. The table uses the original year built, even for a building repaired since, and the tax roll doesn’t record leaks. A building from 1989 may have new walls, and one from 1997 may need work. This guide never says a building leaks or is sound.
Vancouver strata units built 1980 to 2002, the leaky-condo era, by year built
Data refreshed . Source: City of Vancouver Open Data Portal: Property tax report.
| Year built | Strata units |
|---|---|
| 1980 | 1,342 |
| 1981 | 1,870 |
| 1982 | 1,882 |
| 1983 | 1,343 |
| 1984 | 825 |
| 1985 | 1,373 |
| 1986 | 1,749 |
| 1987 | 1,231 |
| 1988 | 1,610 |
| 1989 | 2,311 |
| 1990 | 2,230 |
| 1991 | 2,007 |
| 1992 | 1,570 |
| 1993 | 2,964 |
| 1994 | 5,243 |
| 1995 | 4,320 |
| 1996 | 3,186 |
| 1997 | 3,914 |
| 1998 | 4,236 |
| 1999 | 4,341 |
| 2000 | 3,395 |
| 2001 | 944 |
| 2002 | 2,847 |
How we collected it
Count of strata units (legal type 'STRATA') in every zone on the City of Vancouver's 2026 property tax report (report year 2026), by the year the main building was built, for 1980 to 2002. YearBuilt is BC Assessment's year built from permit records, as published in the City's 2026 property tax report; for the oldest houses it is often an estimate, so single years with unusually high counts (for example round years) reflect how the year was recorded, not a building boom. A property built in the period may since have been substantially renovated (the report's separate 'big improvement year' is not used). Addresses and values are not used. Contains information licensed under the Open Government Licence - Vancouver (https://opendata.vancouver.ca/pages/licence/).
- Period covered
- 2026
- Data refreshed
- November 22, 2026
- Download
- The full table as CSV
Six checks before you buy or renovate a condo from these years
- Confirm the year built. The City’s property tax report, which the table on this page counts, lists a year built for strata units. A year from 1988 to 1990, or 1994, falls in the windows CMHC named.
- Ask whether the building has had an envelope renovation, and when. The year built in this table doesn’t change after a repair, so the strata’s records are where the work shows. Ask the strata council or property manager for the dates and scope of any work on the walls, windows and balconies.
- Read the strata’s reports and minutes. Ask for any engineering or depreciation report that covers the building envelope, and for recent council and general meeting minutes. Look for planned work on walls, windows, balconies and roofs, and for how the owners plan to pay for it.
- Don’t count on a home warranty from construction. BC’s Homeowner Protection Act requires home warranty insurance on a new home. It must cover the building envelope, including water penetration, for at least 5 years, and structural defects for at least 10. For a building from this table, even a 10-year term that began at completion has run out.
- Ask whether the walls are rainscreened. The City has required a rainscreen on all new one- and two-family houses since May 1, 2007. That bulletin covers houses only, and we found no matching City date for condo buildings. So ask the strata whether the walls were built or rebuilt as a rainscreen, instead of guessing from the year.
- List what your renovation touches. Under Standard Bylaw 5, you need the strata’s written approval before altering the structure, the exterior, balconies, or exterior doors and windows. Standard Bylaw 6 adds common property, and your building’s filed bylaws can add more. Each item is explained in strata approval for renovations in BC.
For a bathroom renovation or a kitchen renovation in a unit from these years, checks 2 and 6 come first. They show what the building has been through and what you need approved. To talk through your plans, book a free on-site consultation.
Four mistakes owners make with an older condo
Each one rests on a common assumption about an older condo: what its build year proves, which walls and windows are yours, and what a contractor’s licence covers.
Reading the year as a verdict
A 1994 building isn’t proof of a leak, and a 1984 one isn’t proof of sound walls. The repair records decide, and they sit with the strata, not on the tax roll.
Treating the outside wall as yours
Unless the strata plan shows otherwise, your strata lot ends midway through a wall that separates it from common property. Cutting into the exterior wall can mean altering the exterior and common property, which Bylaws 5 and 6 put behind the strata’s written approval.
Swapping a window or balcony door without approval
Exterior doors and windows are on Bylaw 5’s list, and so are balconies and the railings around them. The strata can’t refuse without good reason, but it can make you agree in writing to cover related expenses.
Assuming the envelope contractor needs a provincial licence
BC’s Building Envelope Renovation Regulation doesn’t apply to a multi-unit building first occupied 25 or more years before the renovation starts. It also skips jobs costing less than $10,000 or $2,000 per unit, whichever is greater. That covers most of the buildings in this guide’s table, so the licence won’t screen a contractor for you.
Who does what: the owner, the strata and the contractor
The owner asks the strata in writing before any work on Bylaw 5’s list or on common property, reads the filed bylaws, and keeps every approval with the permit papers.
The strata corporation answers those requests. It can attach a condition, such as your written agreement to cover expenses related to the alteration. When a City of Vancouver permit covers work on common or limited common property, the strata’s written approval has to reach the City before the permit is issued.
The contractor builds to those approvals and to the permits. In Vancouver, moving an interior wall, or an existing pipe, wire or gas line, takes a City permit. Units outside the City of Vancouver get their permits from the local municipality, under its own by-laws.
Questions people ask
What years are Vancouver's leaky condos from?
The years most tied to the problem are 1988 to 1990 and 1994. In CMHC's 1996 survey of coastal BC envelope failures, almost 50% of problem buildings came from the first window and another 16% from 1994. A survey sample can't clear or condemn one building, though. A condo from 1985 or 1999 still needs its own records read, and so does one from 1989.
What changed in BC after the leaky condo crisis?
The Barrett Commission released its report on condominium construction on June 18, 1998, with 82 recommendations. The Homeowner Protection Act was assented to on July 30, 1998. It requires home warranty insurance on new homes: at least 2 years for materials and labour, 5 for the building envelope and 10 for structural defects. In Vancouver, new one- and two-family houses have needed a rainscreen since May 1, 2007.
Is there a list of leaky condos in Vancouver?
This guide doesn't name buildings, and the City's tax-roll data in it counts units by year built, not by repair history. For one building, the records that matter sit with its strata: envelope reports, repair history, and council and general meeting minutes. Ask for them before you buy, and have someone qualified read them if walls, windows or balconies come up.
Do I need strata approval to replace the windows in my condo?
Yes, if the windows are on the building's exterior or front on common property: Standard Bylaw 5 requires the strata's written approval before that work. Your building's filed bylaws can add conditions. If the job also needs a City of Vancouver permit and involves common property, the City needs the strata's sign-off in writing before issuing it.
Sources
- CMHC Technical Series 98-102: Survey of Building Envelope Failures in the Coastal Climate of British Columbia (1998)
- City of Vancouver council report: The Barrett Commission of Inquiry into the Quality of Condominium Construction (1998)
- BC Laws: Homeowner Protection Act [SBC 1998] chapter 31
- BC Laws: Building Envelope Renovation Regulation (B.C. Reg. 240/2000)
- City of Vancouver Bulletin 2009-009-BU: Rainscreen design and inspection for one and two family dwellings
- BC Laws: Strata Property Act, Schedule of Standard Bylaws