Strata approval for renovations in BC, and Vancouver's strata letter
Strata approval for renovations in British Columbia is needed in writing when the work touches the building's structure, exterior or common property, under Standard Bylaws 5 and 6. In Vancouver, a permit for work on common or limited common property also needs the strata's signed approval letter before the City issues it.
By the Delwin Construction team Updated
Standard Bylaw 5 lists the work that needs the strata’s written approval
In British Columbia, Standard Bylaw 5 says you need the strata corporation’s written approval before altering your strata lot if the work involves:
- (a) the structure of a building;
- (b) the exterior of a building;
- (c) chimneys, stairs, balconies or other things attached to the exterior of a building;
- (d) doors, windows or skylights on the exterior of a building, or that front on the common property;
- (e) fences, railings or similar structures that enclose a patio, balcony or yard;
- (f) common property located within the boundaries of a strata lot;
- (g) the parts of the strata lot that the strata corporation must insure under the Act.
The strata must not unreasonably withhold approval. It may require you to agree in writing to take responsibility for any expenses relating to the alteration (Bylaw 5(2)).
The list names parts of the building, not rooms. So the same kitchen can need approval or not, depending on what the work touches. Item (g) can reach inside your unit, since it covers parts of the strata lot the strata must insure. Ask your strata what that includes in your building. The table sets each item beside the City of Vancouver’s strata-letter rule.
| Strata's written approval (Standard Bylaws) | Strata letter with a City of Vancouver permit | |
|---|---|---|
| The building's structure | Yes, Bylaw 5(1)(a) | Yes, when the work involves common property |
| The exterior, or things attached to it (balconies, stairs, chimneys) | Yes, Bylaw 5(1)(b) and (c) | Yes, when it involves common property; the City lists exterior walls as typical |
| Exterior doors, windows or skylights, or ones that front on common property | Yes, Bylaw 5(1)(d) | Yes, when common property is involved |
| Fences or railings around a patio, balcony or yard | Yes, Bylaw 5(1)(e) | Yes, when common property is involved |
| Common property inside your unit, such as certain pipes or ducts that serve other units | Yes, Bylaw 5(1)(f) | Yes: the City lists services serving more than one unit |
| Parts of your unit the strata must insure | Yes, Bylaw 5(1)(g); ask your strata what this covers in your building | Not stated in the City's bulletin; ask the City |
| Common or limited common property (the City's typical examples: walls between suites and corridors, attic spaces, shared services) | Yes, Bylaw 6 | Yes, Bulletin 2003-014-AD |
| Work only inside your own unit that touches none of the above | Not required by the Standard Bylaws; your filed bylaws may require it | Not required if you own the unit and the work affects only your unit, without adding to its unit entitlement |
Changes to common property need approval under Standard Bylaw 6
Standard Bylaw 6 covers work beyond your unit. You need the strata’s written approval before altering common property, including limited common property, or common assets. Here too, the strata can ask you to take responsibility for related expenses in writing.
Under the Act, common property is the part of the land and buildings on the strata plan that isn’t in a strata lot. It also takes in certain pipes, wires, cables and ducts that serve more than one unit. Limited common property is common property set aside for the exclusive use of one or more units’ owners.
The City of Vancouver lists typical examples: exterior walls, walls between suites and public corridors, attic spaces, and services serving more than one unit. Your strata plan shows where those lines fall.
For a kitchen renovation in Vancouver or a bathroom renovation in a strata home, note any wall shared with another suite or a corridor. Note any drain, water line or duct that also serves another unit, too.
Your building’s filed bylaws can add rules, so read them first
Section 120 of the Strata Property Act makes the Standard Bylaws your strata’s bylaws, except where different bylaws are filed in the land title office. So your building can add to or change the rules above.
The province gives moving walls, changing flooring, and plumbing or electrical changes as examples of work a building’s bylaws may require written permission for. That permission is often called an alteration agreement. Your strata must give every owner and tenant access to its bylaws and rules, so get the current set first.
Bylaw 5 has one built-in exception: it doesn’t apply to a strata lot in a bare land strata plan (Bylaw 5(3)). In those plans, survey markers set the lot lines, not a building’s floors, walls or ceilings. Bylaw 6, on common property, has no such exception.
This guide quotes the Standard Bylaws and City rules. It isn’t legal advice.
The City asks for a strata letter when common property is involved
In Vancouver, City Bulletin 2003-014-AD requires the strata’s written approval before the City issues a building or trade permit in two cases:
- the work involves common or limited common property;
- work inside one unit increases its unit entitlement, meaning its share of the complex’s total square footage.
The City doesn’t ask for it when the permit applicant owns the strata lot and the work affects only that lot. The bylaws can still require the strata’s approval.
The City checks the letter itself. Its checklist for minor renovation permits (December 2022) says the strata’s chairperson signs it, showing the strata knows about and accepts the proposal. The letter must be dated, with the signer’s printed name and position. For the site plan, the City may accept two pages from your Land Title and Survey Authority (LTSA) strata plan instead. One shows the whole site and building; the other shows your floor, with your strata lot marked.
Whether the project needs a City permit at all is covered in which renovations need a City of Vancouver permit.
To talk through a kitchen or bathroom renovation in Vancouver, book a free on-site consultation.
Ask in writing before work starts, and keep the approval
Both bylaws require approval before the work, and the City wants the strata letter before it issues the permit. So the order is the strata’s written reply, then the permit, then the trades. Check how long renovation permits take in Vancouver when you set dates.
In your request, describe the work, attach drawings, and name the parts of the building it touches. Keep the approval, any expense agreement and the strata letter with your permit papers.
Strata corporations must enforce their bylaws and rules, and the province says that can include fines for owners who don’t follow them. If work that needs a City permit starts without one, work must stop while the permit is processed. The penalty is typically double the original permit fee. Work already done may have to be removed, and the homeowner pays even if a contractor said no permit was needed.
Questions people ask
Do I need strata approval to renovate my kitchen or bathroom?
Under the Standard Bylaws, it depends on what the work touches, not on the room. You need written approval if it alters the structure, an exterior window, common property or parts of your unit the strata must insure. Common property includes certain pipes and ducts that serve other units. Ask your strata what it insures, and read your filed bylaws, which can add more.
Do I need strata approval to replace my flooring?
The Standard Bylaws don't mention flooring. But the province names changing flooring as an example of work a building's own bylaws may require written permission for. So the answer is in your building's filed bylaws and rules. Read them, and if they're unclear, ask the strata council in writing before you order materials.
Can the strata say no to my renovation?
Standard Bylaw 5(2) says the strata corporation must not unreasonably withhold its approval for alterations to a strata lot. It may make approval depend on your written agreement to take responsibility for any expenses relating to the alteration. Bylaw 6 allows the same condition for common property. Your filed bylaws may set different terms, and this guide isn't legal advice.
Who signs the strata letter the City asks for?
The City of Vancouver's checklist for minor renovation permits says the strata's chairperson signs it, confirming the strata knows about and accepts the proposal. The letter must be dated and show the signer's printed name and position. If the site has more than one strata, residential and commercial, the City wants a letter from each.
Sources
- Strata Property Act, Schedule of Standard Bylaws (BC Laws)
- Strata Property Act, section 1 definitions (BC Laws)
- Province of British Columbia: Strata bylaws and rules explained
- City of Vancouver Bulletin 2003-014-AD: Permits for Strata Buildings
- City of Vancouver: Field Review and TIPS Minor Renovation Building Permit Application Requirements