Fence height in Vancouver: the limit for each yard
The maximum fence height in Vancouver is 1.2 m in a front yard and 1.9 m in side and rear yards under the Zoning and Development By-law. The City's fence page skips the permit up to 4 ft in front and 6 ft behind, so build to 1.2 m and 6 ft to meet both.
By the Delwin Construction team Updated
The by-law sets 1.2 m in front and 1.9 m at the side and rear
Section 10 of Vancouver’s Zoning and Development By-law sets fence height. In an R district, a fence in a required front yard, or on its edge, may be no higher than 1.2 m. In any other required yard, or on its edge, the limit is 1.9 m. A required yard is the setback your zoning keeps open along a property line.
The City’s web page on building a fence or wall gives a second set of numbers. On a single detached house or duplex lot, it says a fence along the property lines needs no permit up to 4 ft in front. Along the side and rear, the no-permit height is 6 ft. The two sources don’t line up. 1.2 m is just under 4 ft, and 1.9 m is just over 6 ft. The table shows both as each read on November 22, 2026, and the height that satisfies both.
Outside the City of Vancouver, your own municipality’s fence rules apply instead.
| Zoning and Development By-law, Section 10 | City fence page: no permit needed up to | A height that meets both | |
|---|---|---|---|
| Front yard (in or on the edge of the required front yard) | 1.2 m | 4 ft | 1.2 m or lower (1.2 m is just under 4 ft) |
| Side and rear yards (in or on the edge of a required yard) | 1.9 m | 6 ft | 6 ft or lower (1.9 m is just over 6 ft) |
| On or within 1.0 m of a common boundary retaining wall | The yard's limit, reduced by half the retaining wall's height | Ask the City | The reduced by-law limit (example below the table) |
A fence within the no-permit heights has no application and no fee
A fence that stays within the heights that meet both sources needs no permit, so there is no application to make and no City fee to pay. A fence over those heights falls outside the City’s no-permit allowance, so ask the City what it needs before you order materials.
A fence is often one part of a bigger yard plan. Our outdoor living renovations cover decks, patios and covers; to plan the whole yard with us, book a free on-site consultation.
With no permit there is no inspection, so the measuring is up to you
No City inspector visits a fence built without a permit. That puts the check on the owner and the builder: the limit depends on which required yard the fence stands in, or which yard’s edge it follows. Measure where the fence will actually run, then compare each stretch with the limit for that yard.
Check the ground along the line too. A common boundary retaining wall, or one within 1.0 m of the fence, lowers the limit. Example: a side-yard fence within 1.0 m of a 1.0 m retaining wall loses half the wall’s height, 0.5 m, so 1.9 m becomes 1.4 m.
A compliant fence has no permit wait, only the construction noise hours
A fence within the no-permit heights has no City approval to wait for. The work itself still follows the Noise Control By-law. On private property, construction noise is allowed 7:30 a.m. to 8 p.m. on weekdays and 10 a.m. to 8 p.m. on Saturdays. On Sundays and holidays, no construction noise is allowed on private property at all.
A taller fence needs the City’s answer before work starts, so ask the City how long its review takes. If the fence is part of a larger project with a building permit, our page on how long renovation permits take in Vancouver shows the City’s typical waits.
A fence over the limit may have to come down
An over-height fence built without the approval it needed is work without a permit. The City can require work already done to be removed, with a penalty that typically doubles the original permit fee. That cost falls on the homeowner, even if the builder said no permit was needed. Measuring each stretch before the posts go in avoids that.
Retaining walls lower the limit, and the no-permit rule covers houses and duplexes
Two conditions change the numbers in the table. The first is a retaining wall on the shared lot line. On top of a common boundary retaining wall, or within 1.0 m of one, the yard’s limit drops by half the wall’s height. A retaining wall more than 1.2 m high is itself defined as a building under the Vancouver Building By-law, a separate set of rules from the fence limits.
The second is the type of lot. The City’s no-permit heights are written for single detached house and duplex lots. On any other lot, ask the City before you build. If the fence goes up with a new deck, our deck permit guide covers the separate rules for the deck itself.
Questions people ask
Do I need a permit for a 6 ft fence in Vancouver?
Not along the side and rear of a house or duplex lot. The City's fence page allows 6 ft there without a permit, and the by-law limit of 1.9 m is slightly higher. In the front yard it's a different answer. The by-law caps a front-yard fence at 1.2 m, and the no-permit height there is 4 ft, so a 6 ft front fence is over both.
How much lower does a fence have to be next to a retaining wall?
By half the retaining wall's height, when the fence sits on top of a common boundary retaining wall or within 1.0 m of one. The reduction comes off the yard's normal limit. For example, a side-yard fence within 1.0 m of a wall 1.0 m high can reach 1.4 m: the 1.9 m limit minus half of 1.0 m.
Is the Vancouver fence height limit 4 ft or 1.2 m?
Both figures are the City's, from two different sources. For a front yard, 1.2 m is the Zoning and Development By-law limit and 4 ft is the height the City's fence page allows without a permit. 1.2 m is just under 4 ft, so a 1.2 m fence meets both. At the side and rear, the by-law says 1.9 m, the page says 6 ft, and 6 ft is the lower.