GST new housing rebate for a substantial renovation: the 90% test
The GST new housing rebate for a substantial renovation returns 36% of the GST paid, up to $6,300, when generally 90% or more of the interior is removed or replaced. The house and its land must also be worth less than $450,000 when the work is substantially completed, and the rebate shrinks above $350,000.
By the Delwin Construction team Updated
CRA treats a gutted house as new under the 90% test
The GST/HST new housing rebate is a federal rebate from the Canada Revenue Agency (CRA), explained in its Guide RC4028. A house that has been substantially renovated is generally treated as newly built. For that, CRA says the interior is essentially gutted: generally 90% or more of it must be removed or replaced.
The test counts livable areas only. Main floors and finished basements and attics are in, while garages and crawl spaces are left out. You don’t have to replace the foundation, exterior or interior supporting walls, roof, floors or staircases to pass. If you do, the GST on that work goes into the rebate as well.
Any fair and reasonable method can show the 90%. CRA’s examples compare the renovated livable floor area with the house’s total, or the renovated floor and wall area with the house’s total floor and wall area.
The rebate is the same in Vancouver as anywhere in Canada. The City’s part is the permit: renovations that move interior walls or existing plumbing, electrical or gas lines need one in Vancouver. Other Metro Vancouver municipalities have permit rules of their own.
BC runs a separate test under the Homeowner Protection Act, whose definition of a new home includes one that is being substantially reconstructed. A residential builder of a new home must be licensed by BC Housing and arrange home warranty insurance. In BC Housing’s bulletin, the general marker is a reconstructed home that is at least 75% new. Our guide to general contractor licences in BC covers the licensing side.
Example: does a gut renovation qualify, and what could it return?
Example only: an owner removes and replaces over 90% of a house's interior, pays $12,000 in GST on the work, then moves back in as the first occupant (example inputs, not a Delwin price)
- Substantial renovation test Of the livable interior, measured by any fair and reasonable method, such as renovated livable floor area against the total 90 percent
- Rebate rate Of the GST paid on the materials and services for the renovation 36 percent
- GST paid on the renovation (example input) Example figure, not a Delwin price $12,000
- Rebate before the value limit $12,000 × 36% = $4,320, under the $6,300 cap $4,320
- Cap The most one owner-built rebate can return $6,300
- Value limit, house and land together Fair market value when the work is substantially completed: the rebate is reduced in this range and there is none at $450,000 or more $350,000 to $450,000
- Forms Fill out the GST191-WS worksheet first, then Form GST191 GST191, GST191-WS
- Deadline After the base date; when the work is finished before the owner moves in, that's the day it was substantially completed 2 years
Result. If the house and land are worth $350,000 or less when the work is substantially completed, this example returns $4,320. Above $350,000 the amount shrinks, and from $450,000 it falls to nothing, since the value limit counts the land as well as the house.
The owner applies on Form GST191 with the GST191-WS worksheet
The claimant is the individual who substantially renovated their existing house, or hired someone to, for use as their own or a relation’s primary place of residence. A contractor hired to do the work isn’t the builder for GST purposes. When two or more people do the renovation together, only one of them can be the claimant.
Two forms go in together. Form GST191-WS, the construction summary worksheet, comes first: it works out the GST you paid and helps show whether you qualify. Then Form GST191 calculates the rebate. You can mail both to the tax centre named in the guide, or upload the worksheet in My Account and file online.
The rebate is 36% of the GST paid on the renovation, up to $6,300. It covers GST on construction materials and services for the work, as long as you paid that tax by the date you file.
Planning this work? Book a free on-site consultation for a quote with clear, detailed pricing. Our whole-home renovations in Vancouver are designed, built and managed by one team.
CRA checks your residence, the value and original invoices
The 90% test is only one condition. The CRA also looks at these:
- Residence: your intent to use the house as your or a relation’s primary place of residence has to be clear from the start. A cottage, an investment property or a house meant for later, such as retirement, doesn’t qualify.
- First occupant: you or your relation must be the first to live in the house after the renovation began.
- Value: the fair market value of the house, land and other structures when the work is substantially completed must be under $450,000.
- Invoices: only originals in the name of the claimant or co-owners are accepted. Photocopies, card slips and statements without the original invoice aren’t, and neither are estimates or quotes.
Usually nothing is sent with the forms, except invoices where the vendor charged no GST. The CRA may ask for proof that you live there. Every claim is subject to audit, which can delay the payment.
File within 2 years of the base date
The deadline is two years after a base date, and Guide RC4028 sets that base date as the earliest of three events.
CRA’s Situation 1 covers a house you move back into after the work is done. If the work is substantially completed before you or your relation are the first to move in, the base date is the day it was substantially completed. You still can’t apply until you’ve moved in, because occupying the house is a condition of the rebate.
Substantial completion generally means the work is far enough along that someone can reasonably live in the house. Minor repairs, adjustments or upgrades still outstanding don’t change that.
A basement, garage or deck alone gets no rebate
CRA’s guide is direct: a basement renovation, or adding a garage or a deck to an existing house, doesn’t meet the definition of a substantial renovation by itself.
Additions follow the same logic. An addition isn’t a substantial renovation on its own, because the existing house is what must be substantially renovated, and the 90% test leaves the addition out. If the existing house passes, the GST on the addition counts too.
A porch, sunroom, family room or bedroom by itself isn’t a major addition either. Partly finishing a basement without making it livable doesn’t count toward the 90% test. A house worth $450,000 or more, or a claim filed after the deadline, gets nothing.
Whether to renovate or rebuild at all is a separate decision.
First-time buyers and rentals have separate rebates
The CRA runs a separate first-time home buyers’ (FTHB) GST/HST rebate for first-time buyers who build or substantially renovate a house as their primary place of residence. It has a higher value limit and its own conditions. For owner-built houses, the work must begin on or after March 20, 2025 and before 2031, and be substantially completed before 2036.
If you renovate a house to lease it as someone else’s long-term residence, the new housing rebate doesn’t apply. The CRA points to the GST/HST New Residential Rental Property Rebate (Guide RC4231) instead.
Two other kinds of work can also qualify. Converting a non-residential building into your house qualifies even if the work wouldn’t pass the 90% test. So does a major addition built alongside a substantial renovation, such as a full second storey on a bungalow. If the work also creates a family suite, CRA reduces the expenses claimed for the multigenerational home renovation tax credit by related rebates, such as those for GST/HST.
Questions people ask
What counts as a substantial renovation for the GST rebate?
The CRA's test is that generally 90% or more of the existing house's interior is removed or replaced, so the inside is essentially gutted. Only livable areas count, including main floors and finished basements and attics, but not garages or crawl spaces. The foundation, exterior and supporting walls, roof, floors and staircases can stay. If they're replaced, the GST on that work counts too.
How much is the GST new housing rebate on a renovation?
For a substantially renovated house, it's 36% of the GST you paid on the renovation, up to $6,300. The full rebate applies only when the house and land together are worth $350,000 or less when the work is substantially completed. Between $350,000 and $450,000 the rebate is reduced, and at $450,000 or more there is none.
When do I have to apply for the GST new housing rebate?
Generally within two years of a base date set out in Guide RC4028. If the renovation is substantially completed before you or a relation move back in, the base date is the day it was substantially completed. You can only apply once you've moved in. You can include GST you paid on the work as long as you paid it by the date you file.
Does a basement renovation qualify for the GST new housing rebate?
Not by itself. The CRA's guide says renovating a basement, or adding a garage or a deck to an existing house, doesn't meet the definition of a substantial renovation. Within a whole-house gut renovation, a basement turned into livable space counts toward the 90% test. Partly finishing it without making it livable doesn't.