Multigenerational home renovation tax credit for a suite in Vancouver
The multigenerational home renovation tax credit is a refundable federal credit of 14.5% on up to $50,000 spent creating a secondary unit: up to $7,250 for tax year 2025. The unit must let a senior, or an adult eligible for the disability tax credit, live with a relative, and only one renovation can ever be claimed for that person.
By the Delwin Construction team Updated
The credit is federal, and the unit must meet Vancouver’s permits
The multigenerational home renovation tax credit (MHRTC) comes from the Income Tax Act, and the Canada Revenue Agency (CRA) runs it. It’s a refundable credit for the cost of creating a self-contained secondary unit. The purpose is to let a senior, or an adult eligible for the disability tax credit, live with a qualifying relation.
For tax year 2025, the credit is 14.5% of up to $50,000 in qualifying costs for each completed renovation, to a maximum of $7,250 per claim.
CRA’s definition ties the credit to local rules, because a secondary unit must meet applicable local requirements, permits, codes and by-laws. In Vancouver, adding a suite takes a development and building permit. The City’s Low Density Housing Options How-to Guide, written for new construction, sets a minimum of 37 m² (400 sq ft) for each secondary suite. Our guide to the legal basement suite in Vancouver covers those permits step by step. Other municipalities in Metro Vancouver write their own suite rules.
Example: the multigenerational credit on a basement suite for a parent (tax year 2025)
Example only: qualifying expenses of $60,000 to create a legal secondary suite in a Vancouver house for a parent who is a qualifying individual (example input, not a Delwin price)
- Expenses counted (cap per qualifying renovation) The example's $60,000 is over the cap, so $50,000 counts $50,000
- Rate for tax year 2025 CRA's line 45355 page for tax year 2025 14.5%
- Credit $50,000 × 14.5% = $7,250, the maximum CRA lists for one claim in tax year 2025 $7,250
- Costs above the cap $60,000 − $50,000; this part of the example's costs earns no credit $10,000
- Where it's claimed Expenses are reported on Schedule 12, and the credit goes on line 45355 of the return line 45355
Result. A refundable federal credit of $7,250 for tax year 2025; the $10,000 over the cap gets nothing. The unit must meet local permits: in Vancouver a suite needs a development and building permit, and the City's new-construction how-to guide sets a minimum of 37 m² per suite.
The relative who paid the costs claims it
The claim belongs to the eligible individual who paid the renovation costs, and they must be resident in Canada for the whole year. There are two ways to qualify. One is to live, or plan to live, in the renovated home as the qualifying individual, their spouse or common-law partner, or a qualifying relation. The other is to own the home and be a qualifying relation.
A qualifying relation is an adult who is a parent, grandparent, child, grandchild, brother, sister, aunt, uncle, niece or nephew of the qualifying individual or of their spouse or partner. When family members share the costs, each one claims only what they paid, and the combined claims for one renovation can’t pass $50,000.
Qualifying expenses are reasonable costs directly attributable to the renovation, made after December 31, 2023. They include work by professionals such as electricians, plumbers, carpenters or architects, plus building plans, permits and equipment rentals. If you do the work yourself, materials and fixtures count, but the value of your labour and tools doesn’t. Our guide to Vancouver building permit fees lists the City’s 2026 rates.
Planning this work? Book a free on-site consultation. For the construction side, see our basement renovations in Vancouver.
CRA checks the unit, the household and the receipts
The CRA’s checklist has three parts, and a claim needs all of them.
- The unit: it must be self-contained, with a private entrance, kitchen, bathroom and sleeping area. It can be newly built, or made from existing space that didn’t already meet local requirements for a secondary unit.
- The household: a qualifying individual must live in the existing home or the new unit. The home must be in Canada and owned by that person or a qualifying relation, and both must ordinarily live there after the renovation.
- The paperwork: each invoice or receipt names the contractor or supplier, their business address and any GST/HST number. It describes the goods or work and where it was done, and gives the dates, the amount and proof of payment in full.
Expenses are reported on Schedule 12 and the credit is claimed on line 45355.
You claim it for the tax year the renovation is completed
The claim goes on the return for the tax year in which the renovation period ended, even if the work took more than a year. CRA says the period begins with the first qualifying expense, such as applying for a building permit. It ends when the renovation is completed, for example when it passes the final inspection.
For a Vancouver suite, CRA’s example and the City’s rule point to the same day: the City doesn’t consider a suite legal until it has passed its final inspection.
The 2026 amount isn’t on the CRA’s line 45355 page yet, because that page covers tax year 2025. The Act sets the rate as the “appropriate percentage” for the year, which it defines as the lowest federal tax rate. CRA’s rate table shows that rate as 14% for 2026.
Missing permits or receipts sink the claim
A claim fails when a condition isn’t met. These are the CRA rules that bear on the renovation itself:
- A unit that doesn’t meet local requirements, permits, codes and by-laws isn’t a secondary unit, so its costs don’t qualify.
- Expenses without receipts don’t count, and neither do amounts reimbursed to you. The claim is reduced by any assistance or related rebates, including GST/HST rebates.
- Goods or services from a relative count only if that relative is registered for GST/HST.
- An expense in this claim can’t also go on the medical expense tax credit or the home accessibility tax credit.
Our guide to the GST new housing rebate for a substantial renovation covers one GST/HST rebate on renovation costs.
A bedroom, a hired caregiver or a second claim don’t qualify
CRA’s own examples show where the line falls. A sunroom turned into a bedroom with an ensuite but no kitchen isn’t a secondary unit. A basement apartment for an unrelated live-in caregiver doesn’t qualify, because the unit must let the qualifying individual live with a qualifying relation. A second renovation for someone a relative has already claimed for doesn’t qualify either, since only one renovation can be claimed for each qualifying individual in their lifetime.
Some costs never count, however the unit is built: routine repairs and maintenance, household appliances, electronic home-entertainment devices, and services such as housekeeping or gardening. Financing costs for the renovation are out as well.
Questions people ask
Who can claim the multigenerational home renovation tax credit?
An eligible individual who paid the renovation costs and was resident in Canada all year. That's the qualifying individual, their spouse or common-law partner, or a qualifying relation such as an adult child, who lives or plans to live in the home. A qualifying relation who owns the home can also claim. If costs were shared, each person claims only what they paid.
Is the multigenerational home renovation tax credit refundable?
Yes. The CRA calls it a refundable tax credit, so you receive a refund if the credit you claim is more than the taxes you owe. That's different from a non-refundable credit, which can only reduce tax owing. For tax year 2025 the credit is 14.5% of up to $50,000 of qualifying costs, so the most one claim can be is $7,250.
Can I claim the multigenerational credit for a laneway house?
It can count. The CRA says the secondary unit doesn't have to be part of the existing building, as long as it's on the same land as the home. It still needs a private entrance, kitchen, bathroom and sleeping area, and it must meet local permits. In Vancouver, a laneway house is allowed only with a single detached house and can be used by family.
Which form do I use for the multigenerational home renovation tax credit?
Schedule 12, Multigenerational Home Renovation Tax Credit, where you report the renovation expenses and calculate the credit. The result goes on line 45355 of your income tax and benefit return, which is where the credit has been claimed for 2024 and later tax years. You can claim more than one qualifying renovation in the same year if each is for a different person.
Sources
- Canada Revenue Agency: Multigenerational home renovation tax credit (line 45355)
- Canada Revenue Agency: MHRTC, Who can claim
- Canada Revenue Agency: MHRTC, Expenses you can claim
- Canada Revenue Agency: MHRTC, How to claim
- Justice Laws: Income Tax Act, section 122.92 (multigenerational home renovation tax credit)