Renovation costs, rebates and tax credits
What a renovation costs in Vancouver beyond the work itself, and what you can get back: City permit fees line by line, BC and federal tax credits, and energy rebates, from the official schedules.
Every guide on renovation costs, rebates and tax credits
-
City of Vancouver building permit fees for renovations in 2026
City of Vancouver building permit fees in 2026 are set by the estimated cost of work: $217 for the first $5,000, then $13.90 per $1,000 up to $50,000. In our worked example, the building, plumbing and electrical permits for a $50,000 bathroom renovation come to about $1,527 at the rates in effect since January 1, 2026.
Cost guide. Updated
-
BC seniors' home renovation tax credit: 10% back, up to $1,000 a year
The BC seniors' home renovation tax credit refunds 10% of up to $10,000 a year in eligible renovation costs, so a household gets at most $1,000 per tax year. It covers only work that makes a home easier or safer to use for someone 65 or older or with a disability, and it's refundable.
Rules and permits. Updated
-
Energy advisor in Vancouver: when your renovation needs one
You need an energy advisor in Vancouver when a house renovation's total project cost is over $255,000, because the City then requires EnerGuide evaluations before and after the work. From $153,000, the building permit also needs a Renovation Energy Upgrade Proposal; under $153,000, no evaluation or upgrades are required.
Process and timeline. Updated
-
Energy Savings Program in BC: who qualifies and what it pays
The Energy Savings Program in BC is for households whose combined pre-tax income is under a limit set by household size: $51,100 for one person at level 1. The home must also be assessed at or under $1,200,000 (levels 1 and 2) or $1,820,000 (level 3), and you pre-register before any work starts.
Rules and permits. Updated
-
GST new housing rebate for a substantial renovation: the 90% test
The GST new housing rebate for a substantial renovation returns 36% of the GST paid, up to $6,300, when generally 90% or more of the interior is removed or replaced. The house and its land must also be worth less than $450,000 when the work is substantially completed, and the rebate shrinks above $350,000.
Rules and permits. Updated
-
Heat pump rebates in Vancouver, by how your home is heated now
Heat pump rebates in Vancouver depend on how the home is heated now: up to $4,000 to replace electric heat, or up to $4,000 for a gas home's dual-fuel system. To take a gas home fully off gas, Better Homes BC's rebate is income-qualified: up to $13,000 through the Energy Savings Program.
Decision guide. Updated
-
Home accessibility tax credit: up to $20,000 of renovations a year
The home accessibility tax credit covers up to $20,000 a year of renovation costs for a person 65 or older or eligible for the disability tax credit. At the 2026 federal rate of 14%, it cuts federal tax by at most $2,800, and it's non-refundable, so it can't pay out more than you owe.
Rules and permits. Updated
-
Insulation rebates in BC, and why Vancouver windows don't qualify
An insulation rebate in BC pays up to $5,500 per home for attic, wall, basement and crawlspace insulation at any income, with no exclusion for the City of Vancouver. Window and door rebates are different: homes inside the City of Vancouver boundary can't get them.
Rules and permits. Updated
-
Multigenerational home renovation tax credit for a suite in Vancouver
The multigenerational home renovation tax credit is a refundable federal credit of 14.5% on up to $50,000 spent creating a secondary unit: up to $7,250 for tax year 2025. The unit must let a senior, or an adult eligible for the disability tax credit, live with a relative, and only one renovation can ever be claimed for that person.
Rules and permits. Updated
What the City charges
The services behind these guides
- Full Home Renovations Whole-home renovations designed, built and managed by one team, from layout and finishes to flooring, fireplaces, cabinets and pantries. Service
- Kitchen Renovations Kitchen renovations that start with a designer to plan the layout and choose cabinets, countertops, backsplash tile, flooring, appliances and fixtures. Service
- Bathroom Renovations Bathroom renovations: flooring, wall and shower tile, lighting, vanities and cabinetry, walk-in showers and tubs. Service
- Basement Renovations Basements finished as living space, home offices, gyms, theatre or entertainment rooms, or a separate residence. Service
Start with a free on-site consultation
We visit the space and send a free quote with clear, detailed pricing. Kiera K. wrote about working with us from the initial consultation to the final touches.