Tree removal permit in Vancouver: the 20 cm rule, fees and documents

You need a tree removal permit in Vancouver to cut down a tree on private property whose trunk is 20 cm or more across, measured 1.4 m above the ground. The first tree in a 12-month period costs $113 and each additional one $324, and off a development site you'll need an ISA-certified arborist's report.

By the Delwin Construction team Updated

Gas cooktop under a white plaster hood, framed by walnut cabinets with glass fronts and a built-in fridge

Trees 20 cm across at 1.4 m need a City permit

The City of Vancouver’s Protection of Trees By-law sets the test. Removing a tree on private property needs a permit if its trunk is 20 cm or more across, measured 1.4 m above the ground. A 20 cm trunk is about 64 cm around, so a tape measure wrapped around the trunk at that height gives a quick first check.

Several stems change the count. A tree, tree row or hedge with more than one stem at 1.4 m needs a permit when the largest two or three stems add up to 20 cm across. The checklist below runs through each test in order. Other Metro Vancouver municipalities write their own tree rules.

Does your tree need a City of Vancouver removal permit?

  1. Measure the trunk 1.4 m above the ground A diameter of 20 cm or more, which is about 64 cm around, needs a permit.
  2. For several stems, or a hedge, add up the largest two or three If their combined diameter at 1.4 m reaches 20 cm, the tree, tree row or hedge needs a permit.
  3. Ask whether the tree was a condition of a plan or permit A tree planted as a condition of an approved plan or permit, such as a replacement tree, needs a permit even when it's smaller.
  4. Check whether the site is a development site If it is, tree removal is approved as part of the development or building permit.
  5. Otherwise, get an arborist's report and a site plan The report must come from an ISA-certified arborist, and the site plan shows existing buildings.
  6. Budget the fee $113 for the first tree you ask to remove in a 12-month period, $324 for each additional tree in that period.
  7. Post the permit while the tree comes down It must be displayed somewhere it can be seen during the removal.
  8. Confirm the tree is on your property This permit is for trees on private property. A City street tree is the City's to deal with.

Tree removal permit in Vancouver: the 20 cm rule, fees and documents

Rules and permits, Permits in Vancouver

Updated

By the Delwin Construction team

Apply with an arborist’s report and a site plan, from $113

On a site that isn’t being developed, the application needs a report by an ISA-certified arborist and a plan of your site showing the existing buildings. ISA is the International Society of Arboriculture. ISA’s Find an Arborist directory lets you check a credential, though listing is voluntary, so a certified arborist may not appear.

The City’s fee is $113 for the first tree you ask to remove in a 12-month period, and $324 for each additional tree in that same period. Removing two trees in one year, for example, means paying $113 for the first and $324 for the second. The City’s page shows no fee year beside the amounts, so check them when you apply.

If the tree stands where you want a new deck or patio, book a free on-site consultation to plan the outdoor work around it.

The City looks at size, stems and the plan behind the tree

The City looks at three things: the trunk’s diameter at 1.4 m, the largest stems’ combined diameter, and whether the tree was a condition of an approved plan. The arborist’s report and the site plan are how the City sees the tree and where it stands before it decides.

Get the permit before the saw, and post it during removal

A tree that meets the tests needs its permit before it comes down. On a development site, that approval comes with the development or building permit, so a tree in the way of new work is settled on that permit’s timeline.

While the tree is being removed, the permit has to be posted where it can be seen. Keep it up until the work is finished.

We haven’t confirmed how long the City takes to issue a tree removal permit, so this guide doesn’t give a time. Apply well before the date you’ve booked for the removal.

A tree planted as a permit condition stays protected

Some trees need a permit at any size. If a tree was a condition of a plan or permit the City approved, such as a replacement tree, it needs a removal permit even below 20 cm. Before taking out a young tree, check whether it was planted to meet an earlier approval on the property.

A deck is a common reason for a tree to come out, and building or altering a deck in Vancouver generally needs its own City permit. For decks and patios in Vancouver, the tree question and the deck permit belong in the same plan. Which renovations need a City of Vancouver permit covers the deck side.

Small single trees and City street trees follow other rules

A single-stem tree under 20 cm at 1.4 m, one that wasn’t a condition of an approved plan or permit, falls below the by-law’s size test.

This permit is for trees on private property. A street tree on the boulevard belongs to the City, and its removal is a separate matter to raise with the City.

When a whole house is coming down, tree approval is one item among several. Demolishing a house in Vancouver lists the rest.

Questions people ask

How big does a tree have to be to need a permit in Vancouver?

Measure the trunk's diameter 1.4 m above the ground. At 20 cm or more, about 64 cm around, removing a tree on private property needs a City of Vancouver permit. For a tree, tree row or hedge with several stems at that height, add the diameters of the largest two or three; 20 cm combined needs a permit too.

How much is a tree removal permit in Vancouver?

The City of Vancouver charges $113 for the first tree you ask to remove in a 12-month period and $324 for each additional tree in that same period. The City's page doesn't show a fee year next to the amounts, so confirm them when you apply. The arborist's report the application needs is a separate cost.

Do I need an arborist report to remove a tree in Vancouver?

On a site that isn't being developed, yes: the City of Vancouver asks for a report by an ISA-certified arborist, plus a site plan. On a development site, tree removal is approved as part of the development or building permit instead. ISA's Find an Arborist directory lets you check a credential, but listing in it is voluntary.