Vancouver Heritage Register by neighbourhood: buildings per local area
The Vancouver Heritage Register by neighbourhood is lopsided: Kitsilano has 486 listed buildings in the City's open data, more than any other local area, while Killarney has 4. Four areas, Kitsilano, Downtown, Strathcona and Mount Pleasant, hold more than half of the 2,263 listed buildings in the City's 2023 data.
By the Delwin Construction team Updated
Key findings: four areas hold more than half the listed buildings
Listed heritage buildings are concentrated in a handful of Vancouver’s 22 local areas. In the City’s open heritage data:
- Kitsilano has 486 listed buildings, the highest count of any local area and more than one in five of the city’s 2,263.
- Downtown follows with 347, then Strathcona with 238 and Mount Pleasant with 206. With Kitsilano, those four areas hold more than half of all the listed buildings.
- Shaughnessy has 107. The seven areas with the fewest listings, Sunset, Renfrew-Collingwood, Marpole, Arbutus-Ridge, Victoria-Fraserview, Oakridge and Killarney, have fewer between them.
- Killarney has 4, the lowest count of the 22.
The chart sets every local area side by side, with Kitsilano marked, and the table under it gives the same counts.
Buildings listed on the Vancouver Heritage Register, by neighbourhood (City open data)
Data refreshed . Source: City of Vancouver Open Data Portal: Heritage sites (Vancouver Heritage Register).
| Local area | Buildings listed on the Heritage Register (2023 data) |
|---|---|
| Kitsilano | 486 |
| Downtown | 347 |
| Strathcona | 238 |
| Mount Pleasant | 206 |
| Grandview-Woodland | 136 |
| West End | 135 |
| Kensington-Cedar Cottage | 110 |
| Shaughnessy | 107 |
| Fairview | 81 |
| Riley Park | 76 |
| Hastings-Sunrise | 62 |
| Kerrisdale | 58 |
| West Point Grey | 52 |
| Dunbar-Southlands | 34 |
| South Cambie | 34 |
| Sunset | 23 |
| Renfrew-Collingwood | 21 |
| Marpole | 19 |
| Arbutus-Ridge | 15 |
| Victoria-Fraserview | 7 |
| Oakridge | 6 |
| Killarney | 4 |
How we collected it
Records in the City's Heritage sites dataset with category 'HERITAGE BUILDINGS' and an evaluation group recorded (A, B or C), which is how the dataset, last updated by the City on 2023-03-24, marks buildings on the Vancouver Heritage Register; counted by the dataset's local area field. Streetscapes, landscape resources, archaeological sites and records without a local area are left out. On October 8, 2024 Council approved an updated Heritage Register policy that phased out the A, B and C grades; the register now lists 2,267 properties with notations for legal protection, so this count describes the register as the City last published it as open data and does not show grades. Listing is not legal protection: protection comes from designation, a heritage conservation area or a covenant, which this count does not separate. Contains information licensed under the Open Government Licence - Vancouver (https://opendata.vancouver.ca/pages/licence/).
- Data refreshed
- November 22, 2026
- Download
- The full table as CSV
The data: one row for each of the City’s 22 local areas
Each row is one of the City’s local areas, the 22 planning areas Council approved in 1969, with the number of buildings the City’s heritage data lists there. The names are the City’s, so they won’t always match the neighbourhood names in a real estate listing.
The count is of building records. Streetscapes, monuments, trees and parks are on the register too, but they’re left out here, because a renovation question is about a building. The table can be downloaded as a CSV for your own sorting.
Methodology: building records the City’s data marks as listed
Every row comes from the City’s Heritage sites dataset, which the City last modified on March 24, 2023. We keep records in the category Heritage Buildings that carry an evaluation group, which is how the 2023 data marks a building on the register. Then we count them by the dataset’s local area field. Records without a local area are left out.
The evaluation group is used only as a yes or no marker. We never show the letter, because Council phased out the A, B and C categories with the register policy it approved on October 8, 2024. The rows were pulled on 22 November 2026. Contains information licensed under the Open Government Licence - Vancouver. We chose the grouping; the City hasn’t reviewed or endorsed this page.
What it means for you: check the address, then the protection
A high count tells you how many listed buildings sit in an area. It tells you nothing about your own house, so look the address up before you price a renovation, especially in Kitsilano, Downtown, Strathcona or Mount Pleasant.
If the house is listed, the next question is whether it’s also legally protected. Listing by itself adds no heritage alteration permit to a renovation; that permit comes in when the listed building also has legal protection. Listing still matters if the house might come down, because Council can hold up a listed building’s demolition for as long as 120 days. Our guide to the Vancouver Heritage Register sets out the listed and protected cases row by row.
A house that isn’t listed can still fall under the City’s character house rules. Character status turns on age, a build date before 1940, and on merit criteria the City sets. See what makes a character house in Vancouver for what keeping one allows.
For work through several rooms of an older house, see our full home renovations. If your address turns out to be listed, book a free on-site consultation to walk through the work before anyone applies for a permit.
Limits of the data: 2023 records, no grades, no protection status
- The data is from March 2023, before the October 2024 policy. The register now counts 2,267 properties, a different unit from the building records counted here.
- The count doesn’t separate listed buildings from protected ones. The dataset has columns for municipal designation, heritage revitalization agreements, heritage conservation areas and covenants, but a listing on its own is not legal protection.
- Some building records carry no evaluation group, and some have no local area. Neither kind is counted.
- Grades are not shown, so the data can’t rank one listed building above another.
- Only the City of Vancouver’s register is counted. Neighbouring Metro Vancouver municipalities keep their own heritage rules.
Last refreshed: we re-check the City’s portal every year
We pull the rows again once a year and check whether the City has published a newer extract. The portal describes the extract as updated annually, but as of 22 November 2026 the file still carried its March 2023 date. If the City publishes register data under the 2024 policy, the counts and this method will change with it. Data refreshed, printed under the table, shows the day of the last pull.
Questions people ask
Which Vancouver neighbourhood has the most heritage buildings?
Kitsilano, with 486 buildings listed on the Vancouver Heritage Register in the City's open data, ahead of Downtown with 347 and Strathcona with 238. The City last updated that data in March 2023, before its 2024 register policy. Read the ranking as a picture of where listed buildings cluster, not as a current tally of the register.
Does being on the Heritage Register stop me renovating?
No. The heritage alteration permit is reserved for listed buildings that also have legal protection, so a listed-only house renovates under the City's normal permit rules. The work itself still needs whatever permits it calls for, such as one to move walls or plumbing. Our guide to the Vancouver Heritage Register sets the two cases side by side.
How often does the City update its heritage register data?
The portal describes the heritage sites extract as updated annually, but the file was last modified on March 24, 2023, and still carried that date on 22 November 2026. Council has since approved a new register policy, on October 8, 2024, and amended it on February 3, 2026. The open data therefore lags the register it describes.
Why does the register list 2,267 properties when the City's data lists 2,263 buildings?
The two totals measure different things on different dates. The register, under its policy as amended on February 3, 2026, counts 2,267 properties. The March 2023 open data holds 2,263 building records that carry the register marker. Six of them have no local area, so the table's 22 rows add up to six fewer. The small gap isn't a count of buildings added or removed, so don't read it that way.