Character house in Vancouver: what counts and what keeping one allows
A character house in Vancouver is typically a single detached house built before January 1, 1940 that meets the City's character merit criteria. Keeping one in R1-1 zoning lets the Director of Planning relax the floor space ratio from 0.60 to 0.65 for an addition, or to 0.85 with an infill house.
By the Delwin Construction team Updated
The rule: built before 1940 and meeting the merit criteria
The City’s rule sits in its guidelines for additions, infill and multiple conversion dwellings in R1-1, RT-7 and RT-9. Their s.2.1 sets two conditions. The house is typically a single detached house built before January 1, 1940, and it meets character merit criteria set by the Director of Planning. The guidelines point to the Zoning and Development By-law for the formal definition. There are two tests, age and merit, and an old house can pass the first and fail the second.
The status pays off in R1-1 zoning. Under the June 2026 R1-1 schedule, the base floor space ratio is 0.60. The Director of Planning may relax it to 0.65 to allow an addition to a kept character house, with or without a secondary suite. With an infill house built alongside a kept character house, the limit can go to 0.85. “May” matters: both are relaxations the City can grant, not rights you can claim.
These figures are for R1-1 as of the June 2026 schedule. Other districts have their own schedules, and municipalities outside Vancouver have their own zoning by-laws. The table below shows what keeping the house changes.
| Without character retention | With character retention | |
|---|---|---|
| Floor space ratio for the house | 0.60 base | Up to 0.65 to allow an addition, if the Director of Planning relaxes it |
| Infill house on the same lot | The 0.85 relaxation isn't available | Up to 0.85 floor space ratio for the house and infill together, if the Director of Planning relaxes it |
| Secondary suite in the house | A conditional use with a single detached house | Still conditional, and the 0.65 relaxation covers a house with a suite too |
| Permit route | No character relaxation to apply for | A separate development permit, needed before the building permit application |
| Character merit criteria | Not needed for the base floor area | The house must meet them to qualify |
| If the house is demolished | At least 75% of materials by weight reused or recycled for a pre-1950 house, or 90% if the City deems it a character house | Not applicable: the house stays |
| Deposit with a demolition permit | $15,310, refunded when the reuse and recycling requirements are met | Not applicable |
Who applies: a relaxation means a development permit first
You or your contractor apply. Where a project asks for a zoning relaxation, the City requires a separate development permit ahead of the building permit application. So a character house addition at 0.65, or an infill at 0.85, starts with a development permit.
The building permit is priced on the City’s 2026 schedule, from $217 for the first $5,000 of estimated cost. Our guide to Vancouver building permit fees works through the rest. A large renovation also brings energy rules: from $153,000 of estimated cost, a home renovation’s building permit needs a Renovation Energy Upgrade Proposal.
For the building work itself, see our full home renovations. Planning work on a character house? Book a free on-site consultation for a detailed quote on the work.
What the City checks: the house against its character criteria
The City checks two things. First, the house itself has to meet the character merit criteria in s.2.1 of the guidelines. The guidelines were adopted October 3, 2017 and amended through March 11, 2025. Second, the design: because the floor area is a relaxation, the Director of Planning decides whether to grant it.
In R1-1, a house that is only being demolished generally skips that review. As of November 2026, the City’s demolition page says such applications need no character assessment and are held to the 75% recycling target.
Timeline: three build dates decide which rules apply
Before any permit clock starts, the year the house was built sorts it into the City’s rules:
- Built before 1910: demolishing it requires salvaging at least 3 metric tonnes of wood. The same applies to any house on the Vancouver Heritage Register.
- Built before January 1, 1940: it can qualify as a character house, if it also meets the merit criteria.
- Built before 1950: the Green Demolition By-law’s recycling rules apply. A demolition must reuse or recycle 75% of the materials by weight, or 90% for a deemed character house, and hazardous materials don’t count toward either figure.
Then the permits run in order: the development permit for the relaxation, then the building permit. The building permit’s own clock is short: work has to start within 6 months of issue, or the permit is void. For the years Vancouver’s older house styles were built, and what the tax roll shows, see our Craftsman house guide.
Skip retention and the base rules and demolition targets apply
Not keeping the house isn’t a breach; it means the incentives don’t apply. An addition is measured against the base 0.60 floor space ratio, and the 0.85 infill relaxation is off the table.
Taking the house down brings the demolition rules in the table, and the higher 90% recycling target applies where the City deems it a character house. The demolition permit carries a $15,310 deposit, and the City keeps part or all of it if the reuse and recycling requirements aren’t met. A qualified person’s hazardous materials inspection has to come before any demolition, under WorkSafeBC’s regulation.
Starting before the permits are issued is a separate problem: the City halts the work and charges a work-without-permit penalty, commonly twice the fee.
Exceptions: other zones, First Shaughnessy and the Heritage Register
- Other zones: the relaxations above are in the R1-1 schedule. The same guidelines also cover RT-7 and RT-9, which have their own district schedules, so check the schedule for your lot’s zone.
- First Shaughnessy: inside that heritage conservation area, altering or demolishing any house needs a heritage alteration permit, character house or not. See the First Shaughnessy guide.
- The Heritage Register: a separate list Council keeps. Being listed puts no heritage permit on a renovation unless the building is also legally protected. Our Vancouver Heritage Register guide explains how to check an address.
Questions people ask
What is a character house in Vancouver?
In the City's guidelines, it's typically a single detached house from before January 1, 1940 that passes the Director of Planning's character merit criteria. Age alone isn't enough; the house has to meet the criteria as well. The status matters most in R1-1 zoning, where keeping a character house can earn extra floor area.
When does the City assess a house's character merit?
The criteria come into play when you ask for a character house relaxation, such as extra floor area for an addition or an infill. Those relaxations apply only to a house that meets them. Demolition works differently. As of November 2026, the City's demolition page says R1-1 demolition applications generally need no character assessment and get the 75% recycling requirement.
Is a character house the same as a heritage house?
No. Character status comes from the City's zoning guidelines and turns on a build date and merit criteria. The Vancouver Heritage Register is a separate list Council keeps, and a listing there doesn't by itself require a heritage alteration permit. A house can be a character house, a listed heritage house, both or neither, so check each before you plan an addition.
Sources
- City of Vancouver: Guidelines for Additions, Infill and Multiple Conversion Dwelling in R1-1, RT-7 and RT-9
- City of Vancouver: Zoning and Development By-law, R1-1 District Schedule
- City of Vancouver: Development permit
- City of Vancouver: Demolition permit with recycling and deconstruction requirements