First Shaughnessy Heritage Conservation Area: when you need a permit

In the First Shaughnessy Heritage Conservation Area, you need a heritage alteration permit to build, add to, alter or demolish a building. Council adopted the area plan on September 29, 2015, and it exempts only same-colour repainting, routine building and garden maintenance, and certain interior alterations.

By the Delwin Construction team Updated

Open-concept white shaker kitchen with a quartz island, brass pulls and globe pendant lights

The rule: the area plan requires a heritage alteration permit

On September 29, 2015, Council adopted the Heritage Conservation Area Official Development Plan and designated First Shaughnessy as a heritage conservation area. Schedule A of that plan requires a heritage alteration permit for new development and for any demolition, construction, alteration or change to an existing building.

The authority is the Vancouver Charter. Once an official development plan creates a heritage conservation area, certain work there needs a heritage alteration permit. That covers subdividing land, starting a new building or an addition, and altering a building, structure or land. The rule covers every lot inside the boundary, whether or not the house is on the Vancouver Heritage Register. So confirm with the City that your lot is inside the area before you plan anything.

Outside the City of Vancouver, Metro Vancouver’s other municipalities write their own heritage rules. The table below sorts common work into what needs the permit and what doesn’t.

Work in the First Shaughnessy Heritage Conservation Area: heritage alteration permit or not
Heritage alteration permit?Where the rule is
A new house, an addition or other new construction Required Area plan, Schedule A, s.1.6; Vancouver Charter s.596B
Exterior alterations or changes to an existing building Required Area plan, Schedule A, s.1.6
Demolishing a building Required Area plan, Schedule A, s.1.6
Subdividing the lot Required Vancouver Charter s.596B
Repainting in the same colours Not required Area plan, Schedule A, s.1.7(a)
Repainting in new colours Required: the exemption covers the existing colours only Area plan, Schedule A, s.1.6 and s.1.7(a)
Certain interior alterations Not required, if the alteration meets the plan's conditions Area plan, Schedule A, s.1.7(b)
Routine building maintenance Not required Area plan, Schedule A, s.1.7(c)
Routine garden maintenance Not required Area plan, Schedule A, s.1.7(d)

First Shaughnessy Heritage Conservation Area: when you need a permit

Rules and permits, Older and heritage homes

Updated

By the Delwin Construction team

Who applies: you or your contractor, with the heritage permit first in line

You or your contractor apply for the heritage alteration permit as part of the project’s permits. The Vancouver Charter also lets the heritage permit vary or add to zoning by-law provisions and development permit terms in a heritage conservation area. That makes it the place to raise a zoning relaxation the design depends on, though it can’t vary the use or the density. Put it at the start of the plan.

Ask the City for the heritage alteration permit’s fee and processing time when you apply. The building, plumbing and electrical permits are priced on the City’s usual schedule, which our guide to Vancouver building permit fees walks through. If the project includes demolition, the City takes a $15,310 deposit with the demolition permit and refunds it when the reuse and recycling requirements are met.

When the project touches the whole house, see our full home renovations, where one team designs, builds and manages the job. Planning work in First Shaughnessy? Book a free on-site consultation and we’ll price the job in detail.

What the City checks: the area’s objectives and its protected houses

The Vancouver Charter sets out what a heritage conservation area plan has to contain. It must describe the special features that justify the designation and state its objectives. The plan or a zoning by-law must also set guidelines for how those objectives are met. In the area, a heritage alteration permit has to follow those guidelines, so read them before the design is drawn.

The plan can also list buildings inside the area as protected heritage property. The City publishes a bulletin on how it reviews a property’s protected heritage status in First Shaughnessy. It took effect March 8, 2016 and was last amended June 30, 2024. If your house may be on that list, ask the City about its status before design work starts.

Timeline: the heritage permit adds a step to most projects

Any project beyond the exemptions carries the heritage alteration permit in addition to the usual building and trade permits. Our renovation permit wait times come from the City’s building permit data, so they don’t include the heritage permit.

Three timing rules apply whatever the heritage permit takes:

  • WorkSafeBC’s rule comes first. A qualified person inspects the house for hazardous materials before renovation or demolition begins, and the owner shares that duty with the employers.
  • If asbestos work rated moderate or high risk follows, WorkSafeBC needs notice of the project 48 hours ahead.
  • A building permit lapses if work hasn’t started 6 months after it’s issued, so time the application to the start of work.

Skip the heritage permit and you risk a fine and a restoration order

The Vancouver Charter makes it an offence to carry out work that requires a heritage alteration permit without having one, or to break a permit’s conditions. An individual can be fined, jailed or both. Separately, Council can go to court for an order that the owner restore the property. City staff can also recommend filing a notice of the contravention on the land title.

The City’s ordinary permit rules apply on top. Unpermitted building work is halted until a permit is processed, and the work-without-permit penalty is typically twice the permit fee. As the owner, you pay it.

Exempt: same-colour paint, routine maintenance and some interior work

The area plan’s exemption list, in Schedule A, s.1.7, is short. Repainting in the existing colours, routine building maintenance and routine garden maintenance need no heritage alteration permit. Certain interior alterations are exempt too, under conditions the clause sets out. The Vancouver Charter allows exactly this: an area plan may set conditions under which the permit rule doesn’t apply.

Exempt from the heritage permit doesn’t mean exempt from other permits. A kitchen renovation inside the house may qualify for the interior exemption, yet moving its plumbing or wiring still needs the City’s building and trade permits. The Vancouver renovation permit rules sort those out. For how the area plan differs from a listing, see the Vancouver Heritage Register guide. The wider Shaughnessy local area has 107 listed buildings in the City’s 2023 data, as our Heritage Register by neighbourhood count shows.

Questions people ask

Do I need a heritage alteration permit to renovate my kitchen in First Shaughnessy?

Not necessarily. The area plan exempts certain interior alterations from the heritage permit, in Schedule A, s.1.7(b), so check your plans against that clause's conditions. A kitchen project that also changes windows, doors or anything else on the outside is an alteration, and that needs the permit. Moving plumbing or wiring still needs the City's usual building and trade permits.

Can I repaint my house in First Shaughnessy without a permit?

Yes, if the new paint matches the existing colours. The area plan exempts same-colour painting from the heritage alteration permit, as it does routine building and garden maintenance. A new colour scheme falls outside that exemption, so treat it like any other change to the outside of the house and apply for the permit first.

Can I demolish a house in First Shaughnessy?

Only with a heritage alteration permit, which the area plan requires for any demolition. For a pre-1950 house, the demolition permit then asks for 75% of the house by weight to be reused or recycled. That rises to 90% for a house the City classes as a character house. Demolishing without the heritage permit is an offence under the Vancouver Charter.

When did First Shaughnessy become a heritage conservation area?

On September 29, 2015. That day Council adopted the Heritage Conservation Area Official Development Plan and designated First Shaughnessy under it. The Vancouver Charter is what lets an official development plan create a heritage conservation area. Since the plan took effect, building, altering or demolishing there has needed a heritage alteration permit, apart from the listed exemptions.