Older and heritage homes
Renovating a Vancouver house or condo built before 1990: what its era tells you, the City's heritage and character rules, and the hazardous materials, oil tanks and drains the City and WorkSafeBC set rules for.
Every guide on older and heritage homes
-
Asbestos testing before renovation in BC: who must test, and when
Asbestos testing before renovation is required in BC: before work starts, the owner and the employers doing it must have a qualified person inspect the building for hazardous materials. The rule names no building age, and since January 1, 2024 the companies that survey for asbestos must hold a WorkSafeBC licence.
Rules and permits. Updated
-
Character house in Vancouver: what counts and what keeping one allows
A character house in Vancouver is typically a single detached house built before January 1, 1940 that meets the City's character merit criteria. Keeping one in R1-1 zoning lets the Director of Planning relax the floor space ratio from 0.60 to 0.65 for an addition, or to 0.85 with an infill house.
Rules and permits. Updated
-
Craftsman house in Vancouver: 7 checks before you renovate
A Craftsman house in Vancouver dates from 1910 to 1930, and 7 checks before you renovate one decide what you can change and which permits apply. The check that changes the most is character status: in R1-1 zoning, keeping a qualifying house can raise the floor space ratio for an addition from 0.60 to 0.65.
Checklist. Updated
-
First Shaughnessy Heritage Conservation Area: when you need a permit
In the First Shaughnessy Heritage Conservation Area, you need a heritage alteration permit to build, add to, alter or demolish a building. Council adopted the area plan on September 29, 2015, and it exempts only same-colour repainting, routine building and garden maintenance, and certain interior alterations.
Rules and permits. Updated
-
Oil tank removal in Vancouver: the City's rule, permit and inspection
Oil tank removal in Vancouver is required once a heating oil tank has sat unused for two years, and a buried one needs the City's $300 permit, valid 90 days. Finding out whether a tank is buried on the lot is the owner's job: the City expects you to hire a contractor to search the property.
Rules and permits. Updated
-
Renovate or rebuild in Vancouver: the permit data and the rules
Choosing to renovate or rebuild in Vancouver starts with the permit clock: home renovation permits took a median 35 days in the 12 months to November 2026, new buildings 170. Once a home is 75% new or keeps 25% or less of its structure, BC Housing treats it as new: licensed builder and warranty, or an exemption like owner-builder authorization.
Decision guide. Updated
-
Vancouver Heritage Register by neighbourhood: buildings per local area
The Vancouver Heritage Register by neighbourhood is lopsided: Kitsilano has 486 listed buildings in the City's open data, more than any other local area, while Killarney has 4. Four areas, Kitsilano, Downtown, Strathcona and Mount Pleasant, hold more than half of the 2,263 listed buildings in the City's 2023 data.
Local data. Updated
-
Vancouver Heritage Register: what a listing means for your renovation
The Vancouver Heritage Register lists 2,267 properties that Council recognizes for their heritage value, but a listing on its own doesn't require a heritage alteration permit to renovate. That permit applies only when a listed building also carries legal protection, such as a designation by-law, a heritage conservation area or a covenant on title.
Rules and permits. Updated
-
Vancouver Special renovation: what to check before you start
Before a Vancouver Special renovation, check 6 rules with the City and the province, from suite permits to the energy requirements that start once the work costs $153,000. The one every job needs, whatever the budget or the house's age, is BC's hazardous materials inspection before work begins.
Checklist. Updated
The services behind these guides
- Full Home Renovations Whole-home renovations designed, built and managed by one team, from layout and finishes to flooring, fireplaces, cabinets and pantries. Service
- Kitchen Renovations Kitchen renovations that start with a designer to plan the layout and choose cabinets, countertops, backsplash tile, flooring, appliances and fixtures. Service
- Bathroom Renovations Bathroom renovations: flooring, wall and shower tile, lighting, vanities and cabinetry, walk-in showers and tubs. Service
- Basement Renovations Basements finished as living space, home offices, gyms, theatre or entertainment rooms, or a separate residence. Service
Start with a free on-site consultation
We visit the space and send a free quote with clear, detailed pricing. Kiera K. wrote about working with us from the initial consultation to the final touches.