Craftsman house in Vancouver: 7 checks before you renovate

A Craftsman house in Vancouver dates from 1910 to 1930, and 7 checks before you renovate one decide what you can change and which permits apply. The check that changes the most is character status: in R1-1 zoning, keeping a qualifying house can raise the floor space ratio for an addition from 0.60 to 0.65.

By the Delwin Construction team Updated

Open-concept white shaker kitchen with a quartz island, brass pulls and globe pendant lights

Why the list matters: what makes a Vancouver Craftsman

The Vancouver Heritage Foundation dates Vancouver’s Craftsman house types to 1910 to 1930. The purest form is a front-gabled bungalow with a low-pitched roof, an integral porch, a small attic window and clinker brick or stone porch piers. The Foundation says that form is common in Kitsilano, and the boxier front-gabled 1½ to 2½ storey type is common in Kitsilano and Grandview. Look for exposed soffits, large brackets under the eaves, double-hung windows, cedar shingles and a full or half front porch. Don’t confuse it with an Arts and Crafts house, which the Foundation places in the English tradition, with steep hipped roofs; Craftsman houses come from the American one.

The chart counts lots in the City’s residential zones by the year their main building was built, from the City’s 2026 property tax report. Those lots hold every style of the period, not only Craftsman houses. Three patterns stand out:

  • The two tallest bars are 1912, with 2,899 lots, and 1910, with 2,378. Don’t read them as exact. The year is assigned by BC Assessment from permit records, and the method note under the table explains why single years can collect more houses than were built in them.
  • Few lots carry a build year from 1915 to 1919, as few as 23 for 1917.
  • The 1920s pick up again, with 1,048 to 1,218 lots a year from 1925 to 1928.

Every house in the chart predates two City lines: January 1, 1940 for character houses and 1950 for demolition recycling. So the checklist that follows applies to the whole era.

Vancouver houses built 1910 to 1930, the Craftsman era, by year built

Data refreshed . Source: City of Vancouver Open Data Portal: Property tax report.

Lots in Vancouver's residential zones by the year the main building was built, 1910 to 1930 (2026 tax roll)
1910: 2,378 1910 2,378 1911: 765 1911 765 1912: 2,899 1912 2,899 1913: 673 1913 673 1914: 507 1914 507 1915: 209 1915 209 1916: 59 1916 59 1917: 23 1917 23 1918: 146 1918 146 1919: 112 1919 112 1920: 549 1920 549 1921: 256 1921 256 1922: 532 1922 532 1923: 378 1923 378 1924: 676 1924 676 1925: 1,058 1925 1,058 1926: 1,048 1926 1,048 1927: 1,218 1927 1,218 1928: 1,104 1928 1,104 1929: 926 1929 926 1930: 929 1930 929
Vancouver houses built 1910 to 1930, the Craftsman era, by year built: the full table
Year built Lots
1910 2,378
1911 765
1912 2,899
1913 673
1914 507
1915 209
1916 59
1917 23
1918 146
1919 112
1920 549
1921 256
1922 532
1923 378
1924 676
1925 1,058
1926 1,048
1927 1,218
1928 1,104
1929 926
1930 929

How we collected it

Count of non-strata lots (legal type 'LAND') in the City's residential zones (zoning classification 'Residential Inclusive', the R1-1 single-lot zone, or 'Residential', the RT, RM and other residential districts) on the City of Vancouver's 2026 property tax report (report year 2026), by the year the main building was built, for 1910 to 1930. YearBuilt is BC Assessment's year built from permit records, as published in the City's 2026 property tax report; for the oldest houses it is often an estimate, so single years with unusually high counts (for example round years) reflect how the year was recorded, not a building boom. A property built in the period may since have been substantially renovated (the report's separate 'big improvement year' is not used). Addresses and values are not used. Contains information licensed under the Open Government Licence - Vancouver (https://opendata.vancouver.ca/pages/licence/).

Period covered
2026
Data refreshed
November 22, 2026

Craftsman house in Vancouver: 7 checks before you renovate

Checklist, Older and heritage homes

Updated

By the Delwin Construction team

The checklist before renovating a Craftsman house

Work through these in order; each answer changes the next one.

  1. Confirm the build year. It sorts the house into the City’s rules: before 1940 for character status, before 1950 for demolition recycling, and before 1910 for wood salvage. The City’s property tax report lists BC Assessment’s year built, taken from permit records. Check it against whatever permit history the City’s online permit search shows for the address.
  2. Look the address up on the Heritage Register. If the house is listed but not legally protected, renovations need no heritage alteration permit; if it’s protected as well, the permit is required. A listing also lets Council delay a demolition for up to 120 days. The Heritage Register guide shows where to look and how to read the result.
  3. Check whether the lot is in First Shaughnessy. Inside that conservation area the heritage permit reaches much further: new building, alteration and demolition all need one. The First Shaughnessy guide lists what’s exempt.
  4. Find out whether it counts as a character house. Age is only the first test; the house must also meet the City’s character merit criteria. Keep a qualifying house in R1-1 and the Director of Planning may allow an addition up to 0.65 floor space ratio, or an infill house with the site at 0.85. Asking for either one means a development permit comes first, ahead of the building permit. See what counts as a character house.
  5. Get a hazardous materials survey before any work starts. BC’s OHS Regulation, s.20.112, requires the owner and the employers to have a qualified person inspect a building for hazardous materials before it’s renovated or demolished. If the survey finds asbestos, WorkSafeBC must get a Notice of Project at least 48 hours before moderate- or high-risk asbestos work begins. Leave the sampling to the qualified person.
  6. Map which parts of the job need a permit. The City wants one when interior walls move or existing plumbing, wiring or gas lines are relocated; paint, new fixtures, cabinets and flooring need none. In a kitchen renovation, new cabinets and fixtures in the old spots need no permit, but relocating the sink’s plumbing or the range’s wiring or gas line does. A renovation estimated at $153,000 or more also has to include a Renovation Energy Upgrade Proposal with the building permit. The full list is in the City’s renovation permit rules.
  7. If the house could come down, plan for the demolition rules. Demolishing a pre-1950 house means reusing or recycling at least 75% of it by weight (90% when the City treats it as a character house), plus a $15,310 deposit. A listed house, or one built before 1910, also needs at least 3 metric tonnes of wood salvaged. The City wants a Hazardous Building Materials Assessment Report before the demolition notification inspection.

Common mistakes with Craftsman renovations

  • Treating the tax-roll year as exact. It’s a starting point for check 1, not proof of the build date.
  • Assuming a listed house is protected. Only legal protection brings the heritage alteration permit.
  • Assuming every Craftsman is a character house. The merit criteria are a separate test from age.
  • Counting on the extra floor area before it’s granted. The 0.65 and 0.85 figures are relaxations the Director of Planning may grant, so a plan that depends on one needs the development permit before the design is final.
  • Opening walls before the hazardous materials survey. The inspection has to come before the work.
  • Relying on the style name. None of the City rules above mention Craftsman; they turn on the build date, a listing, the zone and the merit criteria.

Who does what: owner, contractor, the City

Two obligations land on the owner. The hazardous materials inspection is a duty of the owner as well as the employers doing the work. And the work-without-permit penalty, typically twice the original fee, is the owner’s to pay, even when a contractor said none was needed.

You or your contractor apply for the permits: the development permit for any relaxation, then the building permit and the trade permits. For work across several rooms, see our full home renovations.

The City decides the discretionary parts. The Director of Planning decides whether to relax the floor space ratio for a kept character house. Council can delay a listed house’s demolition. On a legally protected house, the City’s heritage staff are consulted on the permit application.

All of this is City of Vancouver practice; a Craftsman in North Vancouver or New Westminster falls under that municipality’s own rules.

Once you have answers to the seven checks, book a free on-site consultation to get the work priced in detail.

Questions people ask

How old are Craftsman houses in Vancouver?

The Vancouver Heritage Foundation dates Vancouver's Craftsman house types to 1910 to 1930. The City's 2026 tax roll still shows lots with a main building from every year in that span, including 1,218 recorded for 1927. The recorded year is BC Assessment's, taken from permit records, so compare it with the permit history for your address.

Is my Craftsman house a character house?

It's old enough to be one, since every Craftsman built between 1910 and 1930 predates the City's January 1, 1940 line. Whether it counts depends on the second test, the Director of Planning's character merit criteria. The answer matters most in R1-1, where a qualifying house that you keep can take an addition at 0.65 floor space ratio instead of 0.60.

Does a Craftsman house have to be kept?

Not by default, but taking one down carries conditions. Every Craftsman is older than 1950, so the demolition permit sets a recycling target of at least 75% by weight and a $15,310 deposit. A house on the Heritage Register can have its demolition delayed for up to 120 days, and in First Shaughnessy demolition needs a heritage alteration permit.