City of Vancouver building permit fees for renovations in 2026
City of Vancouver building permit fees in 2026 are set by the estimated cost of work: $217 for the first $5,000, then $13.90 per $1,000 up to $50,000. In our worked example, the building, plumbing and electrical permits for a $50,000 bathroom renovation come to about $1,527 at the rates in effect since January 1, 2026.
By the Delwin Construction team Updated
The 2026 building permit fee starts at $217 and rises with the value of the work
The City of Vancouver, BC, charges for each renovation permit by the size of the job. The building permit follows the estimated cost of the work. The plumbing permit follows the number of fixtures, and the electrical permit follows the cost of the electrical work. These are the 2026 fees from the City’s November 2025 fee report, in effect since January 1, 2026.
| What the City charges for | 2026 fee |
|---|---|
| Building permit: work up to $5,000, or the first $5,000 | $217 |
| Building permit: each $1,000 (or part) above $5,000, up to $50,000 | $13.90 |
| Building permit: each $1,000 (or part) above $50,000 | $7.04 |
| Plumbing permit: one, two or three fixtures | $282 |
| Plumbing permit: each fixture after the third | $88.70 |
| Electrical permit: over $1,000 and up to $10,000 of electrical work | $243, plus $79.70 per $1,000 (or part) above $1,000 |
Above $50,000, each $1,000 of work adds $7.04 instead of $13.90. So the building permit grows more slowly on a larger project like a full home renovation. The example below runs a bathroom renovation through these rates.
Example: City permit fees for a $50,000 bathroom renovation in a Vancouver house
Example inputs, not a real job: a bathroom renovation in a Vancouver house with an estimated cost of work of $50,000. The toilet, shower and sink all move, so the plumbing permit covers 3 fixtures, and new lighting adds $3,000 of electrical work.
- Building permit, first $5,000 Flat fee for the first $5,000 of the estimated cost of work $217
- Building permit, next $45,000 45 × $13.90 per $1,000, since $50,000 minus the first $5,000 leaves $45,000 $625.50
- Building permit total $217 + $625.50 $842.50
- Plumbing permit, 3 fixtures Toilet, shower and sink; one, two or three fixtures cost the same $282
- Electrical permit, $3,000 of electrical work $243 + 2 × $79.70, one for each $1,000 above the first $1,000 $402.40
- City permit fees in this example $842.50 + $282 + $402.40 = $1,526.90 $1,526.90
Result. About $1,527 in City permit fees ($1,526.90). That covers the building, plumbing and electrical permits and nothing else.
Worked example: a $50,000 bathroom renovation pays about $1,527 in City fees
The inputs are round example values, not a real job. The building permit is the largest line: $842.50 of the $1,526.90 total. It follows the estimated cost of work, not the size of the room. Any bathroom renovation in Vancouver that moves plumbing or wiring needs a building permit plus the matching trade permits, so expect the same three lines on yours.
To price the renovation itself, book a free on-site consultation.
Plumbing and electrical permits are charged separately
The plumbing fee counts fixtures, and the City’s list goes beyond sinks and toilets. A dishwasher counts too, so a kitchen that moves its sink and dishwasher has 2 fixtures. The electrical rate in the table covers up to $10,000 of electrical work; bigger electrical jobs fall into higher bands in the same schedule.
For small renovations, the City says trade permits are typically applied for by the trade contractors the general contractor hires. Ask whether your quote includes those fees, or whether the plumber and electrician bill them on top.
You may not need a permit at all. The City doesn’t require one for replacing fixtures, cabinets or flooring, or for painting, so a refresh that keeps the walls, plumbing and wiring in place skips these fees. Our guide to renovation permits in Vancouver shows which projects need one.
Energy upgrade proposals, reinspections and penalties are on top
The City’s permit fees aren’t the whole cost of getting a renovation approved and inspected. Plan for these as well:
- Energy upgrade proposal: a larger house renovation may need one from an energy advisor, a separate cost; see the City’s energy requirements for home renovations.
- Reinspections: each reinspection made necessary by faulty work or materials, or by work that wasn’t ready when the inspection was booked, costs $282.
- Work without a permit: the City adds a penalty when work that needs a permit starts without one; our permits guide explains what skipping a permit costs.
- Other City charges: gas permits, damage deposits, and sewer and water servicing fees can apply. So can a street use permit when work uses the street, sidewalk or lane. Each is charged separately, and none is in the example above.
Get the value of work right before you apply
The City works out the building permit fee from the estimated cost of the work. For the electrical permit, that cost includes materials and labour, is estimated by the contractor or owner, and has to satisfy the City Electrician. A realistic, itemized quote gives you a realistic fee before you apply. Make sure the scope on the application matches the scope in the quote.
Ask any contractor, us included, whether the quote includes permit fees and which permits it covers. Once the fees are paid, the wait begins: see how long Vancouver renovation permits take.
Questions people ask
How much is a building permit in Vancouver for a small renovation?
If the estimated cost of the work is $5,000 or less, the City of Vancouver building permit fee is $217 under the 2026 fees. Plumbing and electrical permits are extra when those trades are part of the job. Work that only replaces fixtures, cabinets or flooring, or paints, needs no City permit at all.
When do you pay the City of Vancouver permit fee?
After you apply. For small renovations, City staff assess the fees when they check the application for completeness, and the fees must be paid before the detailed review starts. You can pay online by credit card, in person at the City's Development and Building Services Centre, or by mail. Only the permit holder or applicant can pay online.
Is the permit fee higher if work started without a permit?
Yes. If work that needs a permit has already started, the City's work-without-permit penalty is typically double the original permit fee, and the normal permit fees still apply. As the homeowner, you pay even if your contractor told you no permit was needed.
Sources
- City of Vancouver, Council report RTS 18094: 2026 Fee Increases for Rezoning, Development, Building, and Other Related Applications and Permits (Appendix A)
- City of Vancouver: When you need a permit
- City of Vancouver: Field review
- City of Vancouver: Field Review and Tenant Improvement Program (TIPS) Minor Renovation Building Permit Application Requirements
- City of Vancouver: Energy requirements for home renovations