Skip to main content

Energy Savings Program in BC: who qualifies and what it pays

The Energy Savings Program in BC is for households whose combined pre-tax income is under a limit set by household size: $51,100 for one person at level 1. The home must also be assessed at or under $1,200,000 (levels 1 and 2) or $1,820,000 (level 3), and you pre-register before any work starts.

By the Delwin Construction team Updated

Open-concept white shaker kitchen with a quartz island, brass pulls and globe pendant lights

Better Homes BC sets the income and home-value limits

The CleanBC Better Homes Energy Savings Program (ESP) is the provincial rebate program for income-qualified households in BC. The Ministry of Energy and Climate Solutions funds and administers it, and its current requirements apply to invoices dated on or after July 6, 2026.

Two tests decide eligibility. Your household’s combined pre-tax income must be under the limit for its size, which places it in income level 1, 2 or 3. The largest heat pump rebates go to level 1. The home’s total BC Assessment value must be at or under the cap for that level.

The program is provincial, so a Vancouver home qualifies on the same terms as any other home in BC. The City’s part is the permits the work needs: Vancouver has required a mechanical permit for every new heat pump or other heating system since July 1, 2022. Other Metro Vancouver municipalities set their own permit rules.

A household over the income limits is outside this program, and the heat pump rebates open to any income are the ones it can look at.

Does your household qualify for the Energy Savings Program?

  1. Household income under the limit for your household size and level Count the combined pre-tax income of every adult in the home except dependants. In 2026 the limit is $51,100 for one person at level 1 and $189,800 for four people at level 3.
  2. A home assessed at or under $1,200,000 (levels 1 and 2) or $1,820,000 (level 3) The cap is the home's total BC Assessment value for the year you register. These caps apply to registrations from April 1, 2026.
  3. Pre-registration and an eligibility code before anything is installed For applications from July 6, 2026, the code covers upgrades completed within 3 months of your approval date. After that, you apply again.
  4. An ESP Registered Contractor approved for the upgrade Better Homes BC's Find a Contractor tool lists them. The invoice shows the CleanBC rebate as its own line, taken off what you owe, and self-installs aren't eligible.
  5. A rebate that matches your heat source and type of home A house heated by gas or propane can get up to $13,000 at level 1 for a central ducted or 3-head heat pump. A condo or apartment unit can get up to $5,000 at level 1 through the separate condo rebate.
  6. No insulation or window rebate in the 2026 rules For invoices from July 6, 2026, the summary of maximum rebates covers heat pumps, heat pump water heaters, electrical service upgrades, health and safety work and ventilation. It has no insulation, window or door line.

You pre-register, then a Registered Contractor does the paperwork

You start by pre-registering with Better Homes BC and sending income documents for each adult in the home, other than dependants. Approval gives you an eligibility code. If you rent, the property owner fills in a Landlord Consent Form for you to include.

From there, the contractor carries the claim. Each upgrade must be installed by a Registered Contractor approved for that type of upgrade. The contractor shows the CleanBC rebate on your invoice, deducts it from what you owe and submits the rebate application with its documents.

What you pay is the invoice minus the rebate. Each rebate covers eligible upgrade costs up to its maximum, it can’t exceed the invoiced and paid cost, and costs covered by a warranty or home insurance don’t count.

Planning this work? Book a free on-site consultation for the renovation side of the project. If the heat pump is one part of a whole-home renovation, check the building permit the whole job needs against the exclusions at the end of this page.

The program checks income papers, the home and the invoice

Better Homes BC checks three things before a rebate is paid.

  • Income: a CRA Notice of Assessment or Proof of Income Statement is accepted. So is a Guaranteed Income Supplement notice, a BC Housing SAFER or Rental Assistance Program letter, or an Endorsement Form from a professional such as a social worker.
  • The home: it must be your year-round primary residence. A detached house qualifies, as does a separately metered secondary suite in one, or a duplex, triplex, row home or side-by-side townhome with its own meter. The utility account must be in the resident’s or owner’s name, not a strata corporation’s or landlord’s.
  • The work: the invoice itemizes the rebate, and a heat load calculation may be requested. When gas, propane or oil heat is replaced, the old system’s removal is proven with a local government permit or inspection report, or a dated removal invoice.

Your current heat also limits the choice. In a house heated by electricity, a heat pump rebate is open only to level 1, while gas and propane homes have rebates at all three levels. A home that already has a heat pump, as its main or backup heat, can’t get a heat pump rebate.

Your eligibility code covers upgrades finished within 3 months

The timeline runs from your approval. For applications received on or after July 6, 2026, the eligibility code is valid for upgrades completed within 3 months of the approval date. After that, you have to re-apply to confirm eligibility.

A heat pump inside a larger renovation can wait on a City permit. If you’re approved before that permit is issued, the wait counts against the 3 months. Our guide to Vancouver renovation permit times shows how long the City takes for each type of home.

After installation, the Registered Contractor submits the rebate application within the program’s deadline, which is counted from the invoice date.

Installing first, or doing it yourself, means no rebate

The order is a program rule: participants must pre-register and confirm eligibility before installing upgrades. An upgrade installed before approval doesn’t meet that rule, and self-installations aren’t eligible either.

Earlier rebates can also use up a home’s eligibility. A home gets one rebate payment for a primary heating system and one for a heat pump water heater, counted across a list of programs. That list includes the Home Renovation Rebate Program, FortisBC’s income-qualified and dual-fuel programs and the Energy Conservation Assistance Program. A home that already received an ESP rebate for one upgrade type can’t get it again with a new eligibility code.

Condos, additions and new-construction permits fall outside it

The main program is for houses and other ground-oriented homes. Condos, high-rises and apartment buildings are excluded, as are garages, workshops, additions that increase floor area, and spaces such as a garage or solarium turned into living space.

The scope of a renovation matters too. Better Homes BC excludes renovations whose installations have to meet code compliance and new-construction requirements, including any that need a “New Construction” or “Addition/Alteration” building permit. Homes it defines as “substantially reconstructed” under the Homeowner Protection Act are excluded as well.

Condo owners have a separate ESP Condo and Apartment Rebate for electrically heated units. It pays up to $5,000 at level 1 or $4,000 at level 2 for a ductless mini-split or multi-split heat pump. It has its own assessed-value cap, and the strata corporation completes a consent form.

For no-cost upgrades, BC Hydro and FortisBC run the Energy Conservation Assistance Program, with the same household income limits as ESP level 1. It offers a free home energy evaluation and free installation of recommended upgrades, which may include insulation, while funding lasts. The any-income insulation rebates can’t be combined with Energy Savings Program funding; our guide to insulation and window rebates in Vancouver sets out their rules.

Questions people ask

Who qualifies for the Energy Savings Program in BC?

A household whose combined pre-tax income is under the program's limit for its size, in a BC home that is its year-round primary residence. The home's total assessed value must be at or under $1,200,000 for levels 1 and 2, or $1,820,000 for level 3. For example, the 2026 income limits are $51,100 for one person at level 1 and $189,800 for four people at level 3.

Does the Energy Savings Program cover condos?

The main program doesn't, but a separate ESP Condo and Apartment Rebate does. It's for electrically heated units in apartment, stacked townhome and multiplex buildings that meet the program's building rules, at income levels 1 and 2. It pays up to $5,000 at level 1 or $4,000 at level 2 for a ductless heat pump. The strata corporation fills in a consent form for the pre-registration.

Do I have to pre-register before a heat pump is installed?

Yes. Better Homes BC requires you to pre-register and confirm eligibility before any upgrade goes in, and approval gives you an eligibility code. For applications from July 6, 2026, that code covers upgrades completed within 3 months of the approval date; after that, you re-apply. The Registered Contractor then takes the rebate off your invoice and submits the claim.

What is the Energy Conservation Assistance Program?

It's an income-qualified program from BC Hydro and FortisBC. Eligible households get a free home energy evaluation, energy-saving advice and free installation of the upgrades the evaluation recommends, which may include heat pumps and insulation. Its household income limits match Energy Savings Program level 1, and it runs first-come, first-served while funding lasts. Proof of ECAP eligibility also counts as income proof for the Energy Savings Program.

Start with a free on-site consultation

We visit the space and send a free quote with clear, detailed pricing. Kiera K. wrote about working with us from the initial consultation to the final touches.

Call (604) 808-8567 Book a free on-site consultation