Skip to main content

Insulation rebates in BC, and why Vancouver windows don't qualify

An insulation rebate in BC pays up to $5,500 per home for attic, wall, basement and crawlspace insulation at any income, with no exclusion for the City of Vancouver. Window and door rebates are different: homes inside the City of Vancouver boundary can't get them.

By the Delwin Construction team Updated

Open-concept white shaker kitchen with a quartz island, brass pulls and globe pendant lights

Insulation rebates reach Vancouver homes; window rebates don’t

BC’s Home Renovation Rebate Program is a partnership of the Government of BC, BC Hydro and FortisBC, and CleanBC Better Homes publishes its rules. The current requirements cover invoices dated on or after October 15, 2026.

For insulation, a Vancouver house gets the same offer as the rest of the province. That’s up to $5,500 in total for insulation in attics, exterior walls, basements, crawlspaces and similar spots, whatever the household earns.

Windows and doors are where Vancouver differs. BC Hydro puts it plainly: “Homes within the City of Vancouver municipal boundary aren’t eligible for the Tier 2 window and door rebates.” The line follows the City’s own boundary rather than the Metro Vancouver region, and permits for the work come from whichever municipality the home is in.

Envelope rebates for a Vancouver house, invoices from October 15, 2026 (check each program before you sign)
Rebate or limitConditions
Insulation: attic, exterior walls, basement and crawlspace, other $5,500 Total for the home, any income. Installed by a Home Performance Contractor Network member verified for insulation; self-installs aren't eligible
Attic insulation $900 $0.02 multiplied by the R-value added and the square footage, counted within the $5,500 total
Windows and doors (Tier 2) Not available inside the City of Vancouver Elsewhere in BC: $100 per replaced opening, up to $2,000
Two Upgrade Bonus $300 Two bonus-eligible upgrades installed within 18 months of each other. One bonus per home: this or the next row
Home Energy Improvement Bonus $750 to $2,000 Pre- and post-upgrade EnerGuide evaluations by a program-qualified energy advisor, and at least three bonus-eligible upgrades within 18 months of the first evaluation
Deadline to apply 6 months From the invoice date, with the paid invoice as the supporting document

A network contractor installs the insulation, and you apply

Insulation rebates need an installer from the Home Performance Contractor Network who is verified to offer insulation services. They install to the program’s air sealing and insulation retrofit guide for single-family homes, and self-installations aren’t eligible.

The application is yours to submit, and it needs one document: the invoice. Better Homes BC wants it paid in full, with a zero balance owing and equipment and labour on separate lines. The rebate can’t exceed the cost on the invoice or what you paid.

Planning this work? Book a free on-site consultation to plan the renovation around it. If insulation is one part of a whole-home renovation with insulation upgrades, the permit and reconstruction exclusions further down this page apply to the whole scope.

The rebate follows the R-value you add, location by location

R-value measures how well insulation slows the transfer of heat, and the rebate is calculated from the R-value you add. For the attic, BC Hydro pays $0.02 multiplied by the R-value added and the square footage, up to $900. Exterior wall cavities, exterior wall sheathing, basement or crawlspace walls, and other spots such as exposed floors each have their own rate and maximum.

The program checks what goes in. New insulation has to be batt, loose fill, board or spray foam, never used before, and installed to cut heat loss, so soundproofing doesn’t count. Each location also has a minimum R-value for the new insulation.

Old insulation removed for pests or mould changes the sum. The rebate then counts only the difference in R-value between the new and the old insulation. Any pest infestation or rodent tunnels have to be dealt with first, and the application isn’t processed until they are.

Apply within 6 months of the invoice; bonus upgrades have an 18-month window

The rebate application and its documents are due within 6 months of the invoice date.

Two bonuses reward more than one upgrade, and a home gets only one of them. The Two Upgrade Bonus pays $300 when two bonus-eligible upgrades go in within 18 months of each other. The Home Energy Improvement Bonus pays $750 to $2,000, scaled to how much the home’s EnerGuide rating improves.

For the larger bonus, the pre-upgrade EnerGuide evaluation starts an 18-month window for at least three bonus-eligible upgrades and the post-upgrade evaluation. An insulation location counts as one bonus-eligible upgrade only once its own rebate reaches the program’s minimum. A heat pump that becomes the home’s primary heating counts as one too. Our guide to energy advisors for Vancouver renovations explains what happens during an EnerGuide evaluation.

Self-installs and permit-heavy renovations lose the rebate

Four things put insulation outside the program:

  • installing it yourself, or using an installer who isn’t a network member verified for insulation;
  • insulation that has to meet code compliance and new-construction requirements, which includes any renovation needing a “New Construction” or “Addition/Alteration” building permit;
  • a home the program treats as “substantially reconstructed” under BC’s Homeowner Protection Act;
  • an application sent after the 6-month window.

The third point overlaps with City rules. Moving existing plumbing, electrical or gas lines needs a City of Vancouver permit. Better Homes BC lists moving those same lines, or exterior walls, among the work that can make a home substantially reconstructed. Our guide to which renovations need a City of Vancouver permit lists the work that triggers one.

Condos and income-qualified homes use other programs

Units in condos, high-rises and apartment buildings can’t use the Home Renovation Rebate Program. Neither can garages, workshops and outbuildings, additions that increase floor area, or a garage, solarium or patio converted to living space.

Income-qualified households face a choice of programs. The Home Renovation Rebate Program’s rebates can’t be combined with funding from CleanBC’s Energy Savings Program, and that program’s July 6, 2026 rules include no insulation rebate. Our guide to the Energy Savings Program in BC covers its income limits and BC Hydro and FortisBC’s free assistance program for qualifying homes.

Questions people ask

Can I get a window rebate in Vancouver?

Not through the Home Renovation Rebate Program if the home is inside the City of Vancouver. BC Hydro states that homes within the City's municipal boundary aren't eligible for its Tier 2 window and door rebates. Elsewhere in BC, those pay $100 per replaced opening, up to $2,000. Insulation rebates carry no such exclusion, so a Vancouver house can still claim those.

How much is the attic insulation rebate in BC?

BC Hydro works it out as $0.02 multiplied by the R-value you add and the attic's square footage, up to $900. That counts toward the $5,500 limit for all insulation in the home. A Home Performance Contractor Network member must install it, and the new insulation has to meet the program's minimum R-value for attics.

Do I need an EnerGuide evaluation for an insulation rebate?

Not for the insulation rebate itself: BC Hydro's only required document is the paid invoice. Evaluations come in for the Home Energy Improvement Bonus, which pays $750 to $2,000. It needs pre- and post-upgrade EnerGuide evaluations by a program-qualified energy advisor, plus at least three bonus-eligible upgrades within 18 months of the first evaluation.

Is the insulation rebate from BC Hydro or FortisBC?

Both, through one program. The Home Renovation Rebate Program is a partnership between the Government of BC, BC Hydro and FortisBC, and Better Homes BC publishes a single set of requirements. For questions about an application, Better Homes BC sends BC Hydro and New Westminster electric customers to BC Hydro, and FortisBC customers to FortisBC.

Start with a free on-site consultation

We visit the space and send a free quote with clear, detailed pricing. Kiera K. wrote about working with us from the initial consultation to the final touches.

Call (604) 808-8567 Book a free on-site consultation