Heat pump rebates in Vancouver, by how your home is heated now
Heat pump rebates in Vancouver depend on how the home is heated now: up to $4,000 to replace electric heat, or up to $4,000 for a gas home's dual-fuel system. To take a gas home fully off gas, Better Homes BC's rebate is income-qualified: up to $13,000 through the Energy Savings Program.
By the Delwin Construction team Updated
Your current heating decides which rebates a Vancouver home can get
Vancouver homes get heat pump rebates from province-wide programs run by BC Hydro, FortisBC and CleanBC’s Better Homes. What you can get starts with how the home is heated today. Electric heat opens BC Hydro’s rebates, a gas furnace opens FortisBC’s dual-fuel rebate, and a condo has a program of its own. The table covers invoices from October 15, 2026, when the Home Renovation Rebate Program’s current rules took effect.
Three rules limit stacking. A home gets one primary space-heating rebate, however many systems go in. The any-income Home Renovation Rebate Program can’t be combined with funding from the income-qualified Energy Savings Program. FortisBC’s dual-fuel rebate can’t be combined with other FortisBC, provincial or federal rebate programs, and anyone who has applied under another program isn’t eligible for it.
| Rebate (maximum) | Conditions | |
|---|---|---|
| Electric heat, whole home: detached house, duplex or side-by-side townhome, any income | $4,000 | BC Hydro Home Renovation Rebate, invoices from October 15, 2026. Replaces hard-wired electric heat; Home Performance Contractor Network installer; heat load calculation |
| Electric heat, partial home: covers at least half the heating load, any income | $1,500 | Same program, date and installer rules; the heat pump serves an open living area such as the living room or kitchen |
| Gas heat, any income | $4,000 | FortisBC dual fuel, installations completed from October 15, 2026: a new ducted heat pump plus a new high-efficiency gas furnace, replacing an aging gas furnace. Can't be combined with other provincial or federal rebates |
| Gas or propane heat, income-qualified | $13,000 | CleanBC Energy Savings Program, invoices from July 6, 2026: income level 1, central ducted or 3-head system. Pre-register first; assessed-value limits; the gas heating system comes out |
| Condo or apartment with electric heat | $2,250 | BC Hydro Condo and Apartment Rebate (no effective date on BC Hydro's page, read November 22, 2026): $1,000 for a single-head mini-split, or $750 per head for a multi-split, up to 3 heads; strata approval before the pre-approval code |
| Federal Canada Greener Homes Grant | Closed | December 31, 2025 was the last day to submit documents |
Electric heat: BC Hydro pays up to $4,000 for a whole-home heat pump
A Vancouver house, duplex or side-by-side townhome with electric heat can get up to $4,000 for a heat pump that heats the whole home. Electric heat here means baseboards, radiant ceilings or floors, or an electric furnace. The heat pump must replace that hard-wired electric heat, and any backup heat must also be electric. Your contractor sizes it with a heat load calculation and gives you the summary form and report for the application.
A smaller system can still qualify. A heat pump that covers at least half the home’s heating load and serves an open living area, such as the living room or kitchen, gets up to $1,500. Either way, the unit needs a variable-speed compressor and must be on the program’s rebate-eligible list.
Plan the switch while the old system still works. BC Hydro doesn’t pay for an emergency replacement of a broken electric heating system, for replacing an existing heat pump, or for adding a head to one. Planning renovation work around a new heat pump? Book a free on-site consultation for the building side of the project.
Gas heat: FortisBC’s dual-fuel rebate, or the income-qualified program
A gas-heated Vancouver home has two rebate routes, and they end in different systems. FortisBC’s dual-fuel rebate pays up to $4,000 for a new central ducted heat pump paired with a new high-efficiency gas furnace and a connected thermostat. The system switches to the furnace below a set outdoor temperature, so the home keeps gas.
The furnace being replaced must be the home’s primary heat and old enough to meet FortisBC’s minimum age, so check that figure on FortisBC’s page first. A Technical Safety BC licensed gas contractor on the Home Performance Contractor Network installs it. They complete a commissioning sheet with photos on the day of installation; photos can’t be added later.
The other route takes gas out. The CleanBC Energy Savings Program pays up to $13,000 at income level 1 for a central ducted or 3-head heat pump that replaces gas or propane heating. Income levels 2 and 3 get smaller amounts. The gas heating system has to be removed, and backup heat must be electric or wood, though a gas fireplace can stay as secondary heat. You pre-register and get an eligibility code before any work. The home’s assessed value must be at or under the program’s limit, and the rebate is deducted on the contractor’s invoice.
Outside that income program, Better Homes BC’s rebate for converting a gas home to an all-electric heat pump is limited to homes in northern BC. It doesn’t reach Vancouver.
Condos and apartments have their own BC Hydro rebate
The Home Renovation Rebate Program leaves out condos, high-rises and apartment buildings, so a Vancouver condo owner uses BC Hydro’s Condo and Apartment Rebate instead. It covers replacing a unit’s electric space heating with a heat pump. A single-head mini-split gets $1,000, and a multi-split gets $750 per head, up to $2,250 for 3 heads. The unit has to be heated by electricity now, and renters aren’t eligible.
The order matters. Get a quote and your strata or co-op board’s approval first, then request a pre-approval code before buying anything. The code is valid for 6 months, and the rebate application has to go in within that window. Our guide to strata approval for renovations covers what needs the strata’s written approval. Households that meet CleanBC’s income test are pointed to CleanBC’s own condo rebates instead.
What ended in 2025 and 2026, and what changed in October 2026
Several offers have closed, and the October 2026 rules replaced older ones.
- The federal Canada Greener Homes Grant is closed. December 31, 2025 was the last day to submit documents. The Canada Greener Homes Loan is closed too, and no new applications can be approved.
- BC Hydro’s bonus promotion covered heat pumps completed and paid for between August 1 and October 31, 2026, with applications due by November 30, 2026. Later installations don’t get it.
- The Home Renovation Rebate Program’s requirements changed for invoices dated on or after October 15, 2026. Earlier installations follow the program’s past requirements.
- The dual-fuel route for Vancouver gas homes is new. The requirements for invoices from May 15, 2026 listed dual fuel only for northern homes, and FortisBC’s rebate covers installations completed on or after October 15, 2026.
Before you buy: approved installer, permits and the 6-month deadline
None of these programs pays for a self-installed heat pump, and each one names who may install it. Check that your installer is listed for the rebate you want at the time of installation, since FortisBC and BC Hydro both tie eligibility to that listing. BC Hydro recommends getting three quotes.
The programs also expect the permits. The dual-fuel rules require every electrical, gas and mechanical permit the job needs, and the program can ask for copies. The condo rebate requires work that meets the BC Building Code and municipal and strata bylaws and permit requirements. In Vancouver, installing a heat pump needs a City mechanical permit, a rule in place since July 1, 2022. For the City’s other renovation permits, see which renovations need a City of Vancouver permit. Elsewhere in Metro Vancouver, the local municipality’s permit rules apply instead.
Pay the invoice in full and ask for it itemized, with equipment and labour on separate lines. Then apply within 6 months of the invoice date.
If the heat pump is part of a bigger renovation, check one more rule first. The Home Renovation Rebate Program excludes a home that is “substantially reconstructed” under BC’s Homeowner Protection Act. Better Homes BC says that can include structural repairs, or a renovation that moves exterior walls or existing plumbing, electrical or gas lines. Additions that add floor area, and garages or patios turned into living space, are out as well. If you’re planning a whole-home renovation around a new heating system, settle the rebate question before the design is final.
Questions people ask
Can I get a rebate to switch from gas to a heat pump in Vancouver?
Yes, in two ways. FortisBC pays up to $4,000 for a dual-fuel system: a ducted heat pump with a new high-efficiency gas furnace as backup, so the home keeps gas. To remove gas heating entirely, the provincial rebate is income-qualified: up to $13,000 through the CleanBC Energy Savings Program, if your household qualifies and pre-registers before any work starts.
Do I have to use a registered contractor for a heat pump rebate?
Yes, and self-installations aren't eligible. BC Hydro's home heat pump rebates need a Home Performance Contractor Network member. FortisBC's dual-fuel rebate needs a Technical Safety BC licensed gas contractor who is also on that network. The income-qualified program needs one of its Registered Contractors, and the condo rebate a licensed contractor with a GST number and a BC business licence.
How long do I have to apply for a heat pump rebate after the invoice?
For BC Hydro and FortisBC home rebates, the application and documents must go in within 6 months of the invoice date. The condo rebate counts from the pre-approval code instead, which is valid for 6 months. In the income-qualified program, the Registered Contractor submits the application, and the rebate is taken off your invoice.
Can I get a heat pump rebate for a condo or apartment in Vancouver?
Yes, if the unit is heated by electricity now. BC Hydro's Condo and Apartment Rebate pays $1,000 for a single-head mini-split, or $750 per head for a multi-split, up to $2,250 for 3 heads. Get your strata or co-op board's approval first, then request a pre-approval code before you buy. Renters aren't eligible, and households that meet CleanBC's income test are pointed to CleanBC's own condo rebates instead.
Sources
- City of Vancouver: Heat pumps
- Better Homes BC: Home Renovation Rebate Program requirements for invoices from May 15, 2026 (PDF)
- FortisBC: Dual fuel heating system rebate
- BC Hydro: Heat pump rebates for condo and apartment units
- Government of Canada: Canada Greener Homes Initiative
- BC Hydro: Heat pump rebates (Home Renovation Rebate Program), checked November 22, 2026
- Better Homes BC: Home Renovation Rebate Program requirements, checked November 22, 2026
- FortisBC: Dual fuel heating system rebate, checked November 22, 2026
- Better Homes BC: Energy Savings Program requirements, checked November 22, 2026
- BC Hydro: Condo and Apartment Rebate Program, checked November 22, 2026