Street use permits in Vancouver: bins, deliveries and scaffolding
Vancouver has two street use permits for renovation work, and a bin, delivery or crane lift on the street needs the temporary street occupancy permit. The other, the construction street use permit, is for hoarding, scaffolding, shoring or excavation that reaches into City property, and a new building must have one.
By the Delwin Construction team Updated
A bin or delivery on City property needs an occupancy permit
The City of Vancouver’s temporary street occupancy permit is for things that sit on City property for a short time. Its list includes waste containers and bins, moving containers and construction deliveries. It also covers construction activities such as a crane lift or a concrete pour. On the City’s website, the permit sits on the page for reserving parking spaces and parking meters.
The construction street use permit is a different permit for a different job. A new building needs one when its shoring, excavation, scaffolding or hoarding (a temporary site fence or covered walkway) reaches into City property. Other projects that affect sidewalks, traffic lanes, rear lanes or boulevards may need one too. Burnaby, Richmond and the other Metro Vancouver municipalities issue their own street permits.
| Permit | Does it apply to a renovation of an existing house? | Fee the City mentions | |
|---|---|---|---|
| Bin, moving container or construction delivery on the street, lane or boulevard | Temporary street occupancy permit | Yes, whenever the item sits on City property | An occupancy fee while a bin or other item is stored there |
| Crane lift or concrete pour from the street | Temporary street occupancy permit | Yes, as a construction activity on City property | Not stated |
| Hoarding, scaffolding, shoring or excavation reaching into City property | Construction street use permit | Required for a new building; for other work, including renovations, it may be required | Not stated |
| Bin or delivery entirely on your own lot, back from the sidewalk and boulevard | Neither permit | No: both permits are for City property | None from these permits |
Settle who arranges it, and budget the occupancy fee
If a bin or other item will be stored on City property, the City charges an occupancy fee for it. We haven’t confirmed the current amounts, so this guide doesn’t print them.
Decide in writing who arranges the permit before the bin is ordered. When you compare quotes for a whole-home renovation in Vancouver, check whether each one includes the bin, the permit, the occupancy fee and how long the bin stays.
To see what a renovation quote covers before work starts, book a free on-site consultation.
The City’s line is between placing things and building into its land
Both permits start at the same place: the edge of your lot. A bin entirely on your own lot, back from the sidewalk and boulevard, is on private property. Roll it to the curb, the boulevard or the lane, and it’s on City property. The stretch of driveway that crosses the boulevard counts as City land too.
From there, the question is what the thing does. The occupancy permit is for items placed on City property for a while, such as a bin, a container or a delivery truck. The construction street use permit is for construction that reaches into City property, such as scaffolding over a sidewalk or shoring below it.
Get the permit before the bin or the truck arrives
The City’s rule is about placing the bin, the container or the delivery on City property at all, so the permit has to be in hand before it arrives. The same goes for the day of a crane lift or a concrete pour from the street. On a new house, have the construction street use permit before any hoarding, shoring or excavation reaches City property.
Work on the street also has its own noise hours under the City’s Noise Control By-law. Our guide to construction hours in Vancouver sets them beside the hours for work inside the property line.
Without a permit, keep the bin and the delivery on your own lot
Without a temporary street occupancy permit, the bin, the container and the delivery truck need room on your own land. That means a parking pad, the yard or the part of the driveway inside your lot line. Measure that space before you order a bin size.
If the house is coming down rather than being renovated, the bins are only part of it. Demolishing a house in Vancouver brings its own permit, recycling rules and deposit.
Ask the City before scaffolding goes over a sidewalk or lane
For an existing house, the City’s rule stops short of a yes or no on scaffolding over a sidewalk or lane, so the answer has to come from the City. Ask before the scaffold or hoarding is booked, describe how far it will reach over the sidewalk or lane, and keep the City’s reply with your permit papers.
Street permits are separate from the building and trade permits the work itself may need. Which renovations need a City of Vancouver permit covers those.
Questions people ask
Do I need a permit to put a dumpster on the street in Vancouver?
Yes, when it sits on City property. The City lists waste containers and bins among the things that need a temporary street occupancy permit, and it charges an occupancy fee while a bin is stored there. A bin that stays entirely on your own lot, back from the sidewalk and boulevard, isn't on City property, so this permit isn't the one that covers it.
Does scaffolding over the sidewalk need a permit in Vancouver?
It can. A new building whose scaffolding, hoarding, shoring or excavation reaches into City property needs a construction street use permit. For other projects, renovations included, the City says work affecting sidewalks, traffic lanes, rear lanes or boulevards may also need one. Ask the City before a scaffold goes up over a public sidewalk or lane.
Is there a fee to keep a bin on the street in Vancouver?
Yes. The City of Vancouver charges an occupancy fee when a bin or other item is stored on City property. You still need the temporary street occupancy permit as well. This guide doesn't quote the amount because we haven't confirmed the current one. Ask for it when you apply, and check whether your renovation quote includes it.