Skip to main content

Vancouver building permit search by address: a home's permit history

A Vancouver building permit search by address starts with the City's online permit search, which finds existing permits and applications by address, permit number or date. If what you need isn't there, the City's property research service provides copies of permit documents and formal letters about a property, for a fee.

By the Delwin Construction team Updated

Open-concept white shaker kitchen with a quartz island, brass pulls and globe pendant lights

A permit record shows what the City approved at the address

A permit record tells you what the City of Vancouver approved at an address, and when. Read it before you buy or renovate, and a suite, deck or addition without a matching permit stops being a surprise. The City’s penalty for work started without a needed permit is typically double the original permit fee. It falls on the homeowner, even when a contractor said no permit was needed.

Checking a Vancouver property's permit history

  1. Search the City's online permit search by street address It finds existing permits and applications by address, permit number or date, so work still at the application stage shows up too.
  2. Search the open data for the same address The City's Issued building permits dataset lists each permit issued since 2017, with its issue date, type of work, project value, description and, if known, the contractor.
  3. Read each permit number's prefix In the open data, BP marks a building permit, DB a combined development and building permit, and BU an application first made in the City's older permit software.
  4. Request property research for what the searches don't show The City provides copies of permit documents and formal letters about a property on request, for a fee.
  5. Compare what was permitted with what you see Decks, additions and secondary suites generally need City permits, so one with no matching record is a question to ask before you buy or renovate.
  6. Look for an oil tank record on an older house Until the 1960s most Vancouver furnaces burned oil from a tank buried in the yard, and confirming whether one is still there is the owner's job.
  7. Check the Vancouver Heritage Register A listed building that also carries legal heritage protection needs a heritage alteration permit before it's altered.

Vancouver building permit search by address: a home's permit history

Checklist, Permits in Vancouver

Updated

By the Delwin Construction team

Three City records to search, and what each one shows

Start with the online permit search. Search by the street address, a permit number or a date, and it returns existing permits and applications. It’s also where an applicant looks up an application’s status.

Then open the City’s Issued building permits open data and search the same street number and name. Each row is one permit issued since 2017. It shows the type of work, a description of the scope, the project value the base permit fee was calculated on, the applicant and, if known, the contractor. Our page on Vancouver renovation permit times is built from the same dataset.

Property research covers what the two searches don’t give you. On request and for a fee, the City provides copies of specific permit documents and formal letters about a property. For a basement suite, our legal basement suite guide explains which letter to ask for and what comes after.

If you’re renovating a house you just bought, bring what you find to the people pricing the work. To start with a walk-through of the house, book a free on-site consultation.

Mistakes that make a permit search miss work

  • Reading the open data as the permit’s status. The City says the dataset shows each permit as first issued, without its current status or later changes. For status, go back to the online permit search.
  • Searching with the unit number only. In the open data, a permit for one unit can carry the unit number after the street address, marked with a # sign. Search the street number and name alone, then read every result.
  • Stopping at the first result. The City notes that one project site can have several permits, so a single renovation may appear more than once.
  • Taking the applicant for the owner. The applicant may be the owner or an agent, and the City says it’s often the design professional or their firm.
  • Expecting the open data to cover the whole life of the house. It starts with permits issued in 2017, so earlier work needs the online permit search or a property research request.
  • Reading “no record found” as “no permit needed.” A deck, an addition or a suite with no record calls for more questions before you treat it as exempt. Which renovations need a City of Vancouver permit lists what does.

What you check, what you hand on, and what the City keeps

You run the searches and decide whether to pay for property research. On a house old enough to have had oil heat, the City also makes confirming whether a tank is still buried the owner’s job. It says to hire a contractor to search the property, for example with ground-penetrating radar.

Hand on what you find. A designer or contractor pricing work on the house needs the same permit history you do, so give them the permit numbers and any documents from property research.

The City keeps the records. It runs the online permit search and the property research service, and it publishes the open data, updated daily for the current year while earlier years stay fixed. Each Metro Vancouver municipality keeps its own permit records, so this guide covers the City of Vancouver only.

Questions people ask

Can I see the permits on a house before I buy it?

Yes. The City of Vancouver's online permit search finds permits and applications by address. Its Issued building permits open data lists each permit issued at an address since 2017, with a description of the work. For copies of permit documents or a formal letter about the property, request the City's property research service, which charges a fee.

How do I get copies of old building permits for my house?

Ask the City of Vancouver's property research service. It provides copies of specific permit documents and formal letters about a property on request, and its page lists the fees. Give the address and say which permits you're after. If the question is a basement suite, our legal suite guide covers which letter to ask for.

How do I check a building permit's status in Vancouver?

Use the City of Vancouver's online permit search, which looks up application status and finds permits by address, permit number or date. Don't rely on the open data for this: the City says that dataset shows each permit as it was first issued, without its current status or any changes made after.

Start with a free on-site consultation

We visit the space and send a free quote with clear, detailed pricing. Kiera K. wrote about working with us from the initial consultation to the final touches.

Call (604) 808-8567 Book a free on-site consultation